Information: NOTE: you have arrived at a step in the Design Sequence flow chart. This flow chart is used to determine your performance goal. For more information see this link
image of Minimal Impact Design Standards logo
For more information on the Design Sequence Flow Chart see the following:
*Flexible treatment options
*MIDS flow chart
*List of steps in flow chart

QUESTION:

Are there adverse surface water hydrologic impacts from infiltration practices (e.g. impacting perched wetland)?

Yes

No

PREVIOUS QUESTION and ANSWER:

  • Are there very high infiltrating soils (greater than 8 inches per hour) present on site)?
    • Answer: No

or

  • Is BMP relocation onsite to a lower infiltrating location feasible?
    • Answer: Yes

or

  • Can subgrade be modified to slow the rate of infiltration?
    • Answer: Yes


Links

This page was last edited on 6 February 2014, at 19:17.

Template:Footer

/* Manually replaced by abbott Aug 6 '21 */