Information: NOTE: you have arrived at a step in the Design Sequence flow chart. This flow chart is used to determine your performance goal. For more information see this link
image of Minimal Impact Design Standards logo
For more information on the Design Sequence Flow Chart see the following:
*Flexible treatment options
*MIDS flow chart
*List of steps in flow chart

QUESTION:

Would BMPs accomodating Flexible treatment option 1 avoid adverse hydrologic impacts?

Yes

No

PREVIOUS QUESTION and ANSWER:

  • Can the BMP be relocated to avoid adverse hydrologic impacts?
    • Answer: No


Links

This page was last edited on 6 February 2014, at 15:50.

Template:Footer

/* Manually replaced by abbott Aug 6 '21 */