Information: NOTE: you have arrived at a step in the Design Sequence Flow Chart. This flow chart is used to determine your performance goal. For more information see this link
image of Minimal Impact Design Standards logo
For more information on the Design Sequence Flow Chart see the following:
*Flexible treatment options
*MIDS flow chart
*List of steps in flow chart

QUESTION:

Do the following conditions apply?

and

  • BMP relocation is not feasible

Yes

No

PREVIOUS QUESTION and ANSWER:

You determined that Flexible Treatment Option 2 is feasible and there are no limitations resulting from zoning and land use requirements.


Links

Privacy policy

Template:Footer

/* Manually replaced by abbott Aug 6 '21 */