Information: NOTE: you have arrived at a step in the Design Sequence Flow Chart. This flow chart is used to determine your performance goal. For more information see this link
image of Minimal Impact Design Standards logo
For more information on the Design Sequence Flow Chart see the following:
*Flexible treatment options
*MIDS flow chart
*List of steps in flow chart


QUESTION:

Are there existing or proposed structures or infrastructure that make Flexible Treatment Option 1 not feasible?

Yes

No


PREVIOUS STEP

You determined that flexible Treatment option 1 is feasible.

Links

Privacy policy

Template:Footer

/* Manually replaced by abbott Aug 6 '21 */