Information: NOTE: you have arrived at a step in the Design Sequence Flow Chart. This flow chart is used to determine your performance goal. For more information see this link
image of Minimal Impact Design Standards logo
For more information on the Design Sequence Flow Chart see the following:
*Flexible treatment options
*MIDS flow chart
*List of steps in flow chart
image of stop sign
You have completed the flow chart. Return to Flexible treatment options

Select Flexible Treatment Option (FTO) 2

  • Provide regulations and/or cost estimates documenting infeasibility of meeting the original Performance goal

Flexible Treatment Option 2 (FTO #2)

Applicant attempts to comply with the following conditions:

  1. Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and
  2. Remove 60 percent of the annual total phosphorus load, and
  3. Options considered and presented shall examine the merits of relocating project elements to address varying soil conditions and other constraints across the site.

PREVIOUS STEP

It was determined that

  • there are no site conditions that prevent infiltration and there are no adverse surface water hydrologic impacts from infiltration practices, but
    • there are zoning and land use requirements that make the Performance Goal not feasible and BMP relocation is not feasible; or
    • there are existing or proposed structures or infrastructure that make the Performance Goal not feasible and BMP relocation is not feasible.


You have completed the flow chart


If you created a book documenting your steps in the flow chart, create a pdf document and save the pdf document to your computer. You can then disable the book function.

NOTE: The wiki always keeps the most recent working version of your book in memory. However, if you start a new book, you will lose the previous book.

This page was last edited on 10 February 2014, at 14:37.

Template:Footer

/* Manually replaced by abbott Aug 6 '21 */