(Created page with "{{alert|This section of the manual is being developed|alert-under-construction}} ==SECTION 20 SWPPP AVAILABILITY==")
 
(4 intermediate revisions by one other user not shown)
Line 1: Line 1:
{{alert|This section of the manual is being developed|alert-under-construction}}
+
==SECTION 20 SWPPP AVAILABILITY==
 +
 
 +
===20.1===
 +
<big>[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.33 SWPPP] Availability.</big>
 +
 
 +
===20.2===
 +
<big>[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.23 Permittees] must keep the SWPPP, including all changes to it, and inspections and maintenance records at the site during normal working hours by permittees who have operational control of that portion of the site.</big>
  
==SECTION 20 SWPPP AVAILABILITY==
+
<noinclude>
 +
[[Category:2018 Construction Stormwater General Permit]]
 +
</noinclude>

Revision as of 21:02, 28 September 2021

SECTION 20 SWPPP AVAILABILITY

20.1

SWPPP Availability.

20.2

Permittees must keep the SWPPP, including all changes to it, and inspections and maintenance records at the site during normal working hours by permittees who have operational control of that portion of the site.