Line 4: Line 4:
  
 
===20.1===
 
===20.1===
<big>SWPPP Availability. [Minn. R. 7090]</big>
+
<big>[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.33 SWPPP] Availability.</big>
  
 
===20.2===
 
===20.2===
<big>Permittees must keep the SWPPP, including all changes to it, and inspections and maintenance records at the site during normal working hours by permittees who have operational control of that portion of the site. [Minn. R. 7090]</big>
+
<big>[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.23 Permittees] must keep the SWPPP, including all changes to it, and inspections and maintenance records at the site during normal working hours by permittees who have operational control of that portion of the site.</big>

Revision as of 19:35, 31 July 2018

This site is currently undergoing revision. For more information, open this link.
This section of the manual is being developed

SECTION 20 SWPPP AVAILABILITY

20.1

SWPPP Availability.

20.2

Permittees must keep the SWPPP, including all changes to it, and inspections and maintenance records at the site during normal working hours by permittees who have operational control of that portion of the site.