==SECTION 3 APPLICATION AND COVERAGE EFFECTIVE DATE==
 
==SECTION 3 APPLICATION AND COVERAGE EFFECTIVE DATE==
  
 
===3.1===
 
===3.1===
<big>Application and Coverage Effective Date. [Minn. R. 7090]</big>
+
<big>Application and Coverage Effective Date.</big>
  
 
===3.2===
 
===3.2===
<big>The owner and operator must submit a complete an accurate on-line application with the appropriate fee to the MPCA for each project that disturbs one (1) or more acres of land or for a common plan of development or sale that will ultimately disturb one (1) or more acres. [Minn. R. 7090]</big>
+
<big>The [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.21 owner] and [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.20 operator] must submit a complete an accurate on-line application with the appropriate fee to the MPCA for each project that disturbs one (1) or more acres of land or for a [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.5 common plan of development or sale] that will ultimately disturb one (1) or more acres.</big>
  
 
===3.3===
 
===3.3===
<big>For projects or common plans of development or sale that disturb less than 50 acres or do not discharge stormwater within 1 mile (aerial radius measurement) of a special or impaired water, permittees do not need to submit the SWPPP with the application. Permit coverage for these projects is effective upon application and completing the payment process. [Minn. R. 7090]</big>
+
<big>For projects or common plans of development or sale that disturb less than 50 acres or do not discharge [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.31 stormwater] within 1 mile ([https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.3 aerial radius measurement]) of a special or impaired water, [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.23 permittees] do not need to submit the [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.33 SWPPP] with the application. Permit coverage for these projects is effective upon application and completing the payment process.</big>
  
 
===3.4===
 
===3.4===
<big>For certain projects or common plans of development or sale disturbing 50 acres or more, the complete SWPPP must be included with the application and submitted at least 30 days before the start of construction activity. This applies if there is a discharge point on the project within one mile (aerial radius measurement) of, and flows to, a special water listed in item 23.3 through 23.6 or an impaired water as described in item 23.7. Permit coverage for these projects is effective upon submitting the application and complete SWPPP, completing the payment process and receiving a determination from the MPCA that the review of the SWPPP is complete.  The determination may take longer than 30 days if the SWPPP is incomplete.  If the MPCA fails to contact the permittees within 30 days of application receipt, coverage is effective 30 days after completing the payment process. [Minn. R. 7090]</big>
+
<big>For certain projects or common plans of development or sale disturbing 50 acres or more, the complete SWPPP must be included with the application and submitted at least 30 days before the start of [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.6 construction activity]. This applies if there is a discharge point on the project within one mile (aerial radius measurement) of, and flows to, a special water listed in item [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_23_Discharges_to_Special_(Prohibited,_Restricted,_Other)_and_Impaired_Waters#23.3 23.3] through [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_23_Discharges_to_Special_(Prohibited,_Restricted,_Other)_and_Impaired_Waters#23.6 23.6] or an impaired water as described in item [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_23_Discharges_to_Special_(Prohibited,_Restricted,_Other)_and_Impaired_Waters#23.7 23.7]. Permit coverage for these projects is effective upon submitting the application and complete SWPPP, completing the payment process and receiving a determination from the MPCA that the review of the SWPPP is complete.  The determination may take longer than 30 days if the SWPPP is incomplete.  If the MPCA fails to contact the permittees within 30 days of application receipt, coverage is effective 30 days after completing the payment process.</big>
  
 
===3.5===
 
===3.5===
<big>The application requires listing all persons meeting the definition of owner and operator as permittees. The owner is responsible for compliance with all terms and conditions of this permit.  The operator is responsible for compliance with Sections 3, 4, 6-22, 24 and applicable requirements for construction activity in Section 23. [Minn. R. 7090]</big>
+
<big>The application requires listing all persons meeting the definition of owner and operator as permittees. The owner is responsible for compliance with all terms and conditions of this permit.  The operator is responsible for compliance with Sections [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_3_Application_and_Coverage_Effective_Date 3], [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_4_Termination_of_Coverage 4], [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_6_SWPPP_Amendments 6]-[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_22_Requirements_for_Discharges_to_Wetlands 22], [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_24_General_Provisions 24] and applicable requirements for construction activity in [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_23_Discharges_to_Special_(Prohibited,_Restricted,_Other)_and_Impaired_Waters Section 23].</big>
  
 
===3.6===
 
===3.6===
<big>Permittees will receive coverage notification in a manner determined by the MPCA. [Minn. R. 7090]</big>
+
<big>Permittees will receive coverage notification in a manner determined by the MPCA.</big>
  
 
===3.7===
 
===3.7===
<big>For construction projects where the owner or operator changes (e.g., an original developer sells portions of the property to various homebuilders or sells the entire site to a new owner), the current owner and the new owner or operator must submit a complete permit modification form provided by the MPCA. The current owner and the new owner or operator must submit the form prior to the new owner or operator commencing construction activity or no later than 30 days after taking ownership of the property. [Minn. R. 7090]</big>
+
<big>For construction projects where the owner or operator changes (e.g., an original developer sells portions of the property to various homebuilders or sells the entire site to a new owner), the current owner and the new owner or operator must submit a complete permit modification form provided by the MPCA. The current owner and the new owner or operator must submit the form prior to the new owner or operator commencing construction activity or no later than 30 days after taking ownership of the property.</big>
  
 
===3.8===
 
===3.8===
<big>For construction projects where the owner or operator changes, the current owner must provide a SWPPP to the new owner and operator that specifically addresses the remaining construction activity. The new owner or operator can implement the original SWPPP, modify the SWPPP, or develop a new SWPPP. Permittees must ensure their activities do not render another party's erosion prevention and sediment control BMPs ineffective. [Minn. R. 7090]</big>
+
<big>For construction projects where the owner or operator changes, the current owner must provide a SWPPP to the new owner and operator that specifically addresses the remaining construction activity. The new owner or operator can implement the original SWPPP, modify the SWPPP, or develop a new SWPPP. Permittees must ensure their activities do not render another party's [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.9 erosion prevention] and [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.29 sediment control] [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.4 BMPs] ineffective.</big>
 +
 
 +
<noinclude>
 +
[[Category:2018 Construction Stormwater General Permit]]
 +
</noinclude>

Revision as of 20:58, 28 September 2021

SECTION 3 APPLICATION AND COVERAGE EFFECTIVE DATE

3.1

Application and Coverage Effective Date.

3.2

The owner and operator must submit a complete an accurate on-line application with the appropriate fee to the MPCA for each project that disturbs one (1) or more acres of land or for a common plan of development or sale that will ultimately disturb one (1) or more acres.

3.3

For projects or common plans of development or sale that disturb less than 50 acres or do not discharge stormwater within 1 mile (aerial radius measurement) of a special or impaired water, permittees do not need to submit the SWPPP with the application. Permit coverage for these projects is effective upon application and completing the payment process.

3.4

For certain projects or common plans of development or sale disturbing 50 acres or more, the complete SWPPP must be included with the application and submitted at least 30 days before the start of construction activity. This applies if there is a discharge point on the project within one mile (aerial radius measurement) of, and flows to, a special water listed in item 23.3 through 23.6 or an impaired water as described in item 23.7. Permit coverage for these projects is effective upon submitting the application and complete SWPPP, completing the payment process and receiving a determination from the MPCA that the review of the SWPPP is complete. The determination may take longer than 30 days if the SWPPP is incomplete. If the MPCA fails to contact the permittees within 30 days of application receipt, coverage is effective 30 days after completing the payment process.

3.5

The application requires listing all persons meeting the definition of owner and operator as permittees. The owner is responsible for compliance with all terms and conditions of this permit. The operator is responsible for compliance with Sections 3, 4, 6-22, 24 and applicable requirements for construction activity in Section 23.

3.6

Permittees will receive coverage notification in a manner determined by the MPCA.

3.7

For construction projects where the owner or operator changes (e.g., an original developer sells portions of the property to various homebuilders or sells the entire site to a new owner), the current owner and the new owner or operator must submit a complete permit modification form provided by the MPCA. The current owner and the new owner or operator must submit the form prior to the new owner or operator commencing construction activity or no later than 30 days after taking ownership of the property.

3.8

For construction projects where the owner or operator changes, the current owner must provide a SWPPP to the new owner and operator that specifically addresses the remaining construction activity. The new owner or operator can implement the original SWPPP, modify the SWPPP, or develop a new SWPPP. Permittees must ensure their activities do not render another party's erosion prevention and sediment control BMPs ineffective.