==SECTION 7 BMP SELECTION AND INSTALLATION==
 
==SECTION 7 BMP SELECTION AND INSTALLATION==
  
 
===7.1===
 
===7.1===
<big>BMP Selection and Installation. [Minn. R. 7090]</big>
+
<big>[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.4 BMP] Selection and Installation.</big>
  
 
===7.2===
 
===7.2===
<big>Permittees must select, install, and maintain the BMPs identified in the SWPPP and in this permit in an appropriate and functional manner and in accordance with relevant manufacturer specifications and accepted engineering practices. [Minn. R. 7090]big>
+
<big>[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.23 Permittees] must select, install, and maintain the BMPs identified in the [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.33 SWPPP] and in this permit in an appropriate and functional manner and in accordance with relevant manufacturer specifications and accepted engineering practices.</big>
 +
 
 +
<noinclude>
 +
[[Category:2018 Construction Stormwater General Permit]]
 +
</noinclude>

Revision as of 20:59, 28 September 2021

SECTION 7 BMP SELECTION AND INSTALLATION

7.1

BMP Selection and Installation.

7.2

Permittees must select, install, and maintain the BMPs identified in the SWPPP and in this permit in an appropriate and functional manner and in accordance with relevant manufacturer specifications and accepted engineering practices.