m
 
(3 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 +
{{alert|This page is is a copy of the 2018 CSW permit kept for archival purposes and is no longer in use. |alert-danger}}
 +
For the 2023 permit, visit [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_7_BMP_Selection_and_Stormwater_Management this page]. 
 
==SECTION 7 BMP SELECTION AND INSTALLATION==
 
==SECTION 7 BMP SELECTION AND INSTALLATION==
  
Line 6: Line 8:
 
===7.2===
 
===7.2===
 
<big>[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.23 Permittees] must select, install, and maintain the BMPs identified in the [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.33 SWPPP] and in this permit in an appropriate and functional manner and in accordance with relevant manufacturer specifications and accepted engineering practices.</big>
 
<big>[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.23 Permittees] must select, install, and maintain the BMPs identified in the [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.33 SWPPP] and in this permit in an appropriate and functional manner and in accordance with relevant manufacturer specifications and accepted engineering practices.</big>
 +
 +
<noinclude>
 +
[[Category:Level 2 - Regulatory/Construction (CSW)]]
 +
</noinclude>

Latest revision as of 14:09, 7 August 2023

Warning: This page is is a copy of the 2018 CSW permit kept for archival purposes and is no longer in use.

For the 2023 permit, visit this page.

SECTION 7 BMP SELECTION AND INSTALLATION

7.1

BMP Selection and Installation.

7.2

Permittees must select, install, and maintain the BMPs identified in the SWPPP and in this permit in an appropriate and functional manner and in accordance with relevant manufacturer specifications and accepted engineering practices.

This page was last edited on 7 August 2023, at 14:09.