m
m
Line 15: Line 15:
 
<td>SNOUT</td>
 
<td>SNOUT</td>
 
<td></td>
 
<td></td>
 +
<td>Monthly for the first year, then annual inspection of anti-siphon vent and access hatch. If Bio-Skirt is used, check monthly [http://www.bmpinc.com/sites/default/files/special_files/Maintenance%20Considerations%20for%20SNOUT%20Stormwater%20Quality%20Systems%2010.pdf]</td>
 +
<td>[http://www.bmpinc.com/sites/default/files/special_files/Maintenance%20Considerations%20for%20SNOUT%20Stormwater%20Quality%20Systems%2010.pdf Maintenance considerations]</td>
 
<td></td>
 
<td></td>
<td></td>
+
<td>Sediment removed from sump when it is half full. Trash and floatables removed when 6 in accumulates on surface. If Bio-Skirt is used, replace immediately after oil spill or when 2/3 of boom is submerged (nearly saturated) [http://www.bmpinc.com/sites/default/files/special_files/Maintenance%20Considerations%20for%20SNOUT%20Stormwater%20Quality%20Systems%2010.pdf]</td>
<td></td>
 
<td></td>
 
 
<td></td>
 
<td></td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Eliminator</td>
 
<td>Eliminator</td>
 +
<td>Installs in minutes. Installation instructions [https://www.kleanstream.com/wp-content/uploads/2017/12/Instructions-new.pdf here]. [https://www.kleanstream.com/wp-content/uploads/2017/12/Product_Specs.pdf]</td>
 +
<td>After major storm events</td>
 
<td></td>
 
<td></td>
 
<td></td>
 
<td></td>
<td></td>
+
<td>Catch basin, hood, and filter (if used) cleaned annually [https://www.kleanstream.com/products/]</td>
<td></td>
 
<td></td>
 
 
<td></td>
 
<td></td>
 
</tr>
 
</tr>
Line 33: Line 33:
 
<td>Floatable boom</td>
 
<td>Floatable boom</td>
 
<td></td>
 
<td></td>
 +
<td>Monthly and after major storm events</td>
 
<td></td>
 
<td></td>
 
<td></td>
 
<td></td>
<td></td>
+
<td>Frequent inspection and floatables removal.</td>
<td></td>
 
 
<td></td>
 
<td></td>
 
</tr>
 
</tr>
Line 42: Line 42:
 
<td>Hood</td>
 
<td>Hood</td>
 
<td></td>
 
<td></td>
 +
<td>Monthly and after major storm events</td>
 
<td></td>
 
<td></td>
 
<td></td>
 
<td></td>
<td></td>
+
<td>Frequent inspection and floatables removal.</td>
<td></td>
 
 
<td></td>
 
<td></td>
 
</tr>
 
</tr>
 
</table>
 
</table>

Revision as of 14:13, 4 June 2019

Other water quality devices - installation and maintenance recommendations
Link to this table

Device Installation notes Frequency of inspections Maintenance checklist (link) Permitted on private land/ Maintenance agreement recommended Practices for minimizing sediment and trash buildup Cost considerations (equipment needed and man hours)
SNOUT Monthly for the first year, then annual inspection of anti-siphon vent and access hatch. If Bio-Skirt is used, check monthly [1] Maintenance considerations Sediment removed from sump when it is half full. Trash and floatables removed when 6 in accumulates on surface. If Bio-Skirt is used, replace immediately after oil spill or when 2/3 of boom is submerged (nearly saturated) [2]
Eliminator Installs in minutes. Installation instructions here. [3] After major storm events Catch basin, hood, and filter (if used) cleaned annually [4]
Floatable boom Monthly and after major storm events Frequent inspection and floatables removal.
Hood Monthly and after major storm events Frequent inspection and floatables removal.