This section provides an overview of stormwater wetlands. It includes a discussion of permit applicability, function within the treatment train, cold climate and retrofit suitability, and role in water quality and quantity treatment.

General

Stormwater wetlands are similar in design to stormwater ponds and mainly differ by their variety of water depths and associated vegetative complex. They require slightly more surface area than stormwater ponds for the same contributing drainage area. Stormwater wetlands are constructed stormwater management practices, not natural wetlands. Like ponds, they can contain a permanent pool and temporary storage for water quality control and runoff quantity control.

Wetlands are widely applicable stormwater treatment practices that provide both water quality treatment and water quantity control. Stormwater wetlands are best suited for drainage areas of at least 10 acres. When designed and maintained properly, stormwater wetlands can be an important aesthetic feature of a site.

Function Within Stormwater Treatment Train

Stormwater wetlands are typically installed at the downstream end of the treatment train (they are considered an end-of-pipe BMP). Stormwater wetland size and outflow regulation requirements can be significantly reduced with the use of additional upstream BMPs. However, when a stormwater wetland is constructed, it is likely to be the only management practice employed at a site, and therefore must be designed to provide adequate water quality and water quantity treatment for all regulated storms.

MPCA Permit Applicability

One of the goals of this Manual is to facilitate understanding of and compliance with the MPCA Construction General Permit (CGP), which includes design and performance standards for permanent stormwater management systems. The permit and related documentation can be found online at www.pca.state.mn.us/water/stormwater/stormwater-c.html. These standards must be applied in all projects in which at least one acre of new impervious area is being created, and the permit stipulates certain standards for various categories of stormwater management practices.

For regulatory purposes, stormwater wetlands currently fall under the “Wet Sedimentation Basin” category described in Part III.C.1 of the permit. If used in combination with other practices, credit for combined stormwater treatment can be given as described in Part III.C.4. Due to the statewide prevalence of the MPCA permit, design guidance in this section is presented with the assumption that the permit does apply. Also, although it is expected that in many cases the wetland will be used in combination with other practices, standards are described for the case in which it is a stand-alone practice. Of note, the MPCA will evaluate the need to keep stormwater wetlands under the “wet sedimentation basin” category in future CGP revisions and consider it as a bioretention system instead. Input to MPCA on this would be welcomed.

The following terms are used in the text to distinguish various levels of stormwater wetland design guidance:

  • “Required:” Indicates design standards stipulated by the MPCA Permit (or other consistently applicable regulations).
  • “Highly recommended:” Indicates design guidance that is extremely beneficial or necessary for proper functioning of the wetland, but not specifically required by the MPCA permit.
  • "Recommended:” Indicates design guidance that is helpful for stormwater wetland performance but not critical to the design.

Of course, there are situations, particularly retrofit projects, in which a stormwater pond is constructed without being subject to the conditions of the MPCA permit. While compliance with the permit is not required in these cases, the standards it establishes can provide valuable design guidance to the user. It is also important to note that additional and potentially more stringent design requirements may apply for a particular stormwater wetland, depending on where it is situated both jurisdictionally and within the surrounding landscape.

Retrofit Suitability

As a retrofit, stormwater wetlands have the advantage of providing both educational and habitat value. One disadvantage of wetlands, however, is the difficulty in storing large amounts of runoff without consuming a large amount of land. Therefore, the most common type of wetland retrofit involves the modification of an existing dry or wet pond.

Special Receiving Waters Suitability

The following Table 12.WETL.2 provides guidance regarding the use of wetlands in areas upstream of special receiving waters. This table is an abbreviated version of a larger table in which other BMP groups are similarly evaluated (Chapter 10). The corresponding information about other BMPs is presented in the respective sections of this Manual.

Cold Climate Suitability

Wetland performance can be decreased in spring months when large volumes of runoff occur in a relatively short time carrying the accumulated pollutant load from the winter months. Because stormwater wetlands are relatively shallow, freezing of the shallow pool can occur. Also, freezing of inlet and outlet structures can occur, which will reduce performance of the stormwater wetland. To avoid these problems, the CWP (Caraco and Claytor, 1997) made some general design suggestions, which are adapted as follows:

Inlet pipes should not be submerged, since this can result in freezing and upstream damage or flooding.

Burying all pipes below the frost line can prevent frost heave and pipe freezing. Wind protection can also be an important consideration for pipes above the frost line. In these cases, designs modifications that have pipes “turn the corner” are helpful.

Increase the slope of inlet pipes to a minimum of 1% to prevent standing water in the pipe, reducing the potential for ice formation. This design may be difficult to achieve at sites with flat local slopes.

If perforated riser pipes are used at the outlet, the minimum opening diameter should be ½”. In addition, the pipe should have a minimum 6” diameter.

When a standard weir is used, the minimum slot width should be 3", especially when the slot is tall.

Baffle weirs can prevent ice reformation during the spring melt near the outlet by preventing surface ice from blocking the outlet structure.

Alternative outlet designs that have been successful include using a pipe encased in a gravel jacket set at the elevation of the aquatic bench as the control for water quality events. This practice was both avoids stream warming and is also a non-freezing outlet.

Trash racks should be installed at a shallow angle to prevent ice formation.

Water Quantity Treatment

Stormwater wetlands are well-suited to provide channel protection and overbank flood protection. As in ponds, this is accomplished with live storage (extended detention) above the permanent pool. It is HIGHLY RECOMMENDED that when providing water quantity control in stormwater wetlands, the smallest possible bounce (vertical water level fluctuation) be designed for in order to limit the amount of stress on the vegetation.

Water Quality Treatment

Pollutants are removed from stormwater runoff in a wetland through uptake by wetland vegetation and biota (algae, bacterial), vegetative filtering, soil adsorption, and gravitational settling in the slow moving marsh flow. Volatilization and chemical activity can also occur, breaking down and assimilating a number of other stormwater contaminants such as hydrocarbons.

Pollutant removal efficiencies for selected parameters are provided in Table 12.WETL.3. Optimum effluent concentrations for select parameters are provided in Table 12.WETL.4.

Limitations

The following general limitations should be recognized when considering installation of stormwater wetlands:

  • They require more land than other practices;
  • They requires careful design and planning to ensure wetland hydrology is maintained; and
  • Water quality behavior can change seasonally