(Created page with "=='''Performance goal for new development'''== In April 2011, [http://www.pca.state.mn.us/index.php/water/water-types-and-programs/stormwater/stormwater-minimal-impact-design-...")
 
m
Line 1: Line 1:
 
=='''Performance goal for new development'''==
 
=='''Performance goal for new development'''==
 
In April 2011, [http://www.pca.state.mn.us/index.php/water/water-types-and-programs/stormwater/stormwater-minimal-impact-design-standards-mids.html MIDS] work group members agreed on a performance goal for new development:  For new, nonlinear developments that create more than one acre of new impervious surface on sites without restrictions, stormwater runoff volumes will be controlled and the post-construction runoff volume shall be retained on site for 1.1 inches of runoff from impervious surfaces statewide.  The workgroup is working on a performance goal for redevelopment and linear projects.
 
In April 2011, [http://www.pca.state.mn.us/index.php/water/water-types-and-programs/stormwater/stormwater-minimal-impact-design-standards-mids.html MIDS] work group members agreed on a performance goal for new development:  For new, nonlinear developments that create more than one acre of new impervious surface on sites without restrictions, stormwater runoff volumes will be controlled and the post-construction runoff volume shall be retained on site for 1.1 inches of runoff from impervious surfaces statewide.  The workgroup is working on a performance goal for redevelopment and linear projects.
 +
 +
Redevelopment and linear performance goals will be reached in February, 2013.

Revision as of 15:14, 7 January 2013

Performance goal for new development

In April 2011, MIDS work group members agreed on a performance goal for new development: For new, nonlinear developments that create more than one acre of new impervious surface on sites without restrictions, stormwater runoff volumes will be controlled and the post-construction runoff volume shall be retained on site for 1.1 inches of runoff from impervious surfaces statewide. The workgroup is working on a performance goal for redevelopment and linear projects.

Redevelopment and linear performance goals will be reached in February, 2013.