m |
m |
||
Line 1: | Line 1: | ||
− | {{alert|Information for this page has not developed. It is anticipated this page will be populated in | + | {{alert|Information for this page has not been developed. It is anticipated this page will be populated in summer of 2013|alert-under-construction}} |
=='''Performance goal for new development'''== | =='''Performance goal for new development'''== | ||
In April 2011, [http://www.pca.state.mn.us/index.php/water/water-types-and-programs/stormwater/stormwater-minimal-impact-design-standards-mids.html MIDS] work group members agreed on a performance goal for new development: For new, nonlinear developments that create more than one acre of new impervious surface on sites without restrictions, stormwater runoff volumes will be controlled and the post-construction runoff volume shall be retained on site for 1.1 inches of runoff from impervious surfaces statewide. The workgroup is working on a performance goal for redevelopment and linear projects. | In April 2011, [http://www.pca.state.mn.us/index.php/water/water-types-and-programs/stormwater/stormwater-minimal-impact-design-standards-mids.html MIDS] work group members agreed on a performance goal for new development: For new, nonlinear developments that create more than one acre of new impervious surface on sites without restrictions, stormwater runoff volumes will be controlled and the post-construction runoff volume shall be retained on site for 1.1 inches of runoff from impervious surfaces statewide. The workgroup is working on a performance goal for redevelopment and linear projects. | ||
− | Redevelopment and linear performance goals will be reached in | + | Redevelopment and linear performance goals will be reached in May, 2013. |
In April 2011, MIDS work group members agreed on a performance goal for new development: For new, nonlinear developments that create more than one acre of new impervious surface on sites without restrictions, stormwater runoff volumes will be controlled and the post-construction runoff volume shall be retained on site for 1.1 inches of runoff from impervious surfaces statewide. The workgroup is working on a performance goal for redevelopment and linear projects.
Redevelopment and linear performance goals will be reached in May, 2013.