m |
m |
||
Line 1: | Line 1: | ||
− | {{alert|Information for this page has not been developed. It is anticipated this page will be populated in | + | {{alert|Information for this page has not been developed. It is anticipated this page will be populated in winter of 2014|alert-under-construction}} |
=='''Performance goal for new development'''== | =='''Performance goal for new development'''== |
In April 2011, MIDS work group members agreed on a performance goal for new development: For new, nonlinear developments that create more than one acre of new impervious surface on sites without restrictions, stormwater runoff volumes will be controlled and the post-construction runoff volume shall be retained on site for 1.1 inches of runoff from impervious surfaces statewide. The workgroup is working on a performance goal for redevelopment and linear projects.
Redevelopment and linear performance goals will be reached in May, 2013.