Performance goal for new development

In April 2011, MIDS work group members agreed on a performance goal for new development: For new, nonlinear developments that create more than one acre of new impervious surface on sites without restrictions, stormwater runoff volumes will be controlled and the post-construction runoff volume shall be retained on site for 1.1 inches of runoff from impervious surfaces statewide.

Performance goal for redevelopment and linear

In June, 2013, the MIDS work group members agreed on a performance goal for redevelopment and linear. Nonlinear redevelopment projects on site without restrictions that create one or more acres of new and/or fully reconstructed impervious surfaces shall capture and retain on site 1.1 inches of runoff from the new and/or fully reconstructed impervious surfaces. Linear projects on sites without restrictions that create one acre or greater of new and/or fully reconstructed impervious surfaces, shall capture and retain the larger of the following:

  • 0.55 inches of runoff from the new and fully reconstructed impervious surfaces
  • 1.1 inches of runoff from the net increase in impervious area

Mill and overlay and other resurfacing activities are not considered fully reconstructed. All projects shall first attempt to meet the volume reduction Performance Goal on site. However, if an applicant is unable to achieve the full Performance Goal due to site restrictions as attested by the local authority and documented by the applicant, the Flexible Treatment Options Approach shall be followed.


Related pages

  1. Overview of Minimal Impact Design Standards (MIDS)
  2. Performance goals for new development, re-development and linear projects
  3. Design Sequence Flowchart-Flexible treatment options
  4. Community Assistance Package
  5. MIDS calculator
  6. Training and workshop materials and modules
  7. Technical documents