Permeable Pavement Performance Summary
Link to this table

Event Runoff Volume Performance Summary
Runoff Volume from Direct Watershed (ft3) 518
Runoff Volume from Upstream BMPs (ft3) 0
Retention Volume Provided by BMP (ft3) 3469
Outflow Volume from BMP (ft3) 0
Percent Performance Goal Achieved (%) 100
Annual Performance Goal Summary
Volume Runoff from Direct Watershed (acre-ft.) 0.29
Runoff from Upstream BMPs (acre-ft.) 0
Retention Volume Provided by BMP (acre-ft.) 0.29
Outflow Volume from BMP (acre-ft.) 0
Percent Performance Goal Achieved (%) 100
Phosphorous (P) Particulate P from Watershed (lbs.) 0.13
Particulate P from Upstream BMPs (lbs.) 0
Particulate P Load Reduction (lbs.) 0.13
Particulate P Outflow 0.
Total Percent Particulate P Reduction 100
Dissolved P from Watershed (lbs.) 0.11
Dissolved P from Upstream BMPs (lbs.) 0
Dissolved P Load Reduction (lbs.) 0.11
Dissolved P Outflow (lbs.) 0
Total Percent Dissolved P Reduction (%) 100
Total Suspended Solids (TSS) TSS from Watershed (lbs.) 43
TSS from Upstream BMPs (lbs.) 0
TSS Load Reduction (lbs.) 43
TSS Outflow (lbs.) 0
Total Percent TSS Reduction (%) 100