m
 
(20 intermediate revisions by 3 users not shown)
Line 1: Line 1:
 
==Appendix B. Schedules==
 
==Appendix B. Schedules==
===<span style="color: black">'''Table 2:<br/>Existing Permittees - Schedule of permit requirements'''===
+
 
{| class="wikitable"
+
==Examples of well implemented mulch stabilization practices==
|-
+
<gallery caption="These are some examples where good mulch stabilization practices were used. Click on an image for more information." widths="180px">
! Permit requirement !! Schedule
+
File:Pet_waste_pickup.jpg|alt=mulch application
|-
+
File:Applying mulch 2.jpg|alt=mulch application
| Section 12. Stormwater Pollution Prevention Program (SWPPP)
+
File:Mulch stabilized slope 1.jpg|alt=mulch stabilized slope
Document
+
File:Mulch stabilized slope 2.jpg|alt=mulch stabilized slope
*Submit the SWPPP Document completed in accordance with
+
</gallery>
Section 12
+
 
|  
+
 
*Within 150 days after General Permit issuance
+
[https://stormwater.pca.state.mn.us/index.php?title=File:Model_Pet_Waste_Ordinance.docx Pet Waste Ordinance Model Language]
date.
+
 
|-
+
[[media:Model_Pet_Waste_Ordinance.docx|Pet waste ordinance]]
| Section 13. Stormwater Pollution Prevention Program (SWPPP)
+
 
*Complete revisions to incorporate the new requirements of
+
 
Sections 14 - 23 into current SWPPP.
+
 
|
+
[[Nick Test Page]]
*Within 12 months of the date General Permit
+
 
coverage is extended, unless other timelines have
+
[[Category:Level 2 - General information, reference, tables, images, and archives/Reference]]
been specifically established in the General Permit
 
and identified below.
 
|-
 
|Section 19. Construction Site Stormwater Runoff Control
 
*Complete revisions to Construction Site Stormwater Runoff
 
Control program, including revisions to regulatory mechanism(s),
 
if necessary.
 
*When the CSW Permit is reissued, revise regulatory
 
mechanism(s), if necessary, to be at least as stringent as the
 
requirements for erosion, sediment, and waste controls described
 
in the CSW Permit.  
 
|
 
*Within 12 months of the date General Permit
 
coverage is extended.
 
*Within 12 months of the issuance date of the CSW
 
Permit (expected issuance date of the CSW Permit
 
is August 1, 2023).
 
|-
 
|Section 21. Pollution Prevention/Good Housekeeping for
 
Municipal Operations
 
*Conduct structural stormwater best management practice (BMP)
 
inspections.
 
*Conduct pond and outfall inspections
 
|
 
*Each calendar year.
 
*Prior to the expiration date of the General Permit.
 
|-
 
|Section 22. Discharges to Impaired Waters with a USEPAApproved TMDL that includes an Applicable WLA
 
*Submit all information required in item 22.2.
 
*Meet requirements for applicable WLAs for bacteria, chloride,
 
and temperature in Section 22.
 
|With each annual report.
 
*Within 12 months of the date General Permit
 
coverage is extended.
 
|-
 
|Section 25. Annual Assessment, Annual Reporting, and
 
Recordkeeping
 
*Conduct assessment of the SWPPP.
 
*On a form provided by the Agency, submit an annual report.
 
|
 
*Prior to completion of each annual report.
 
*By June 30th of each calendar year.
 
|}
 

Latest revision as of 18:53, 3 December 2022

Appendix B. Schedules

Examples of well implemented mulch stabilization practices


Pet Waste Ordinance Model Language

Pet waste ordinance


Nick Test Page

This page was last edited on 3 December 2022, at 18:53.