m
 
(13 intermediate revisions by 3 users not shown)
Line 1: Line 1:
 
==Appendix B. Schedules==
 
==Appendix B. Schedules==
===<span style="color: black">'''Table 2:<br/>Existing Permittees - Schedule of permit requirements'''===
+
 
{| class="wikitable" style = "background: transparent;"
+
==Examples of well implemented mulch stabilization practices==
|-
+
<gallery caption="These are some examples where good mulch stabilization practices were used. Click on an image for more information." widths="180px">
!style="text-align: left; background: transparent;"|'''<i>Permit requirement</i> !!style="text-align: left; background: transparent;"|'''<i>Schedule</i>
+
File:Pet_waste_pickup.jpg|alt=mulch application
|-
+
File:Applying mulch 2.jpg|alt=mulch application
| '''Section 12. Stormwater Pollution Prevention Program (SWPPP)<br/>Document'''
+
File:Mulch stabilized slope 1.jpg|alt=mulch stabilized slope
*<i>Submit the SWPPP Document completed in accordance with<br/>Section 12
+
File:Mulch stabilized slope 2.jpg|alt=mulch stabilized slope
|  
+
</gallery>
*Within 150 days after General Permit issuance<br/>date.
+
 
|-
+
 
|'''Section 13. Stormwater Pollution Prevention Program (SWPPP)'''
+
[https://stormwater.pca.state.mn.us/index.php?title=File:Model_Pet_Waste_Ordinance.docx Pet Waste Ordinance Model Language]
*<i>Complete revisions to incorporate the new requirements of<br/>Sections 14 - 23 into current SWPPP.
+
 
|
+
[[media:Model_Pet_Waste_Ordinance.docx|Pet waste ordinance]]
*Within 12 months of the date General Permit<br/>coverage is extended, unless other timelines have<br/>been specifically established in the General Permit<br/>and identified below.
+
 
|-
+
 
|'''Section 19. Construction Site Stormwater Runoff Control'''
+
 
*<i>Complete revisions to Construction Site Stormwater Runoff<br/>Control program, including revisions to regulatory mechanism(s),<br/>if necessary.
+
[[Nick Test Page]]
*<i>When the CSW Permit is reissued, revise regulatory<br/>mechanism(s), if necessary, to be at least as stringent as the<br/>requirements for erosion, sediment, and waste controls described<br/>in the CSW Permit.  
+
 
|
+
[[Category:Level 2 - General information, reference, tables, images, and archives/Reference]]
*Within 12 months of the date General Permit<br/>coverage is extended.
 
*Within 12 months of the issuance date of the CSW<br/>Permit (expected issuance date of the CSW Permit<br/>is August 1, 2023).
 
|-
 
|'''Section 21. Pollution Prevention/Good Housekeeping for<br/>Municipal Operations'''
 
*<i>Conduct structural stormwater best management practice (BMP)<br/>inspections.
 
*<i>Conduct pond and outfall inspections
 
|
 
*Each calendar year.
 
*Prior to the expiration date of the General Permit.
 
|-
 
|'''Section 22. Discharges to Impaired Waters with a USEPA-<br/>Approved TMDL that includes an Applicable WLA'''
 
*<i>Submit all information required in item 22.2.
 
*<i>Meet requirements for applicable WLAs for bacteria, chloride,<br/>and temperature in Section 22.
 
|
 
*With each annual report.
 
*Within 12 months of the date General Permit<br/>coverage is extended.
 
|-
 
|'''Section 25. Annual Assessment, Annual Reporting, and<br/>Recordkeeping'''
 
*<i>Conduct assessment of the SWPPP.
 
*<i>On a form provided by the Agency, submit an annual report.
 
|
 
*Prior to completion of each annual report.
 
*By June 30th of each calendar year.
 
|}
 

Latest revision as of 18:53, 3 December 2022

Appendix B. Schedules

Examples of well implemented mulch stabilization practices


Pet Waste Ordinance Model Language

Pet waste ordinance


Nick Test Page

This page was last edited on 3 December 2022, at 18:53.