Line 5: | Line 5: | ||
!style="text-align: left; background: transparent;"|'''<i>Permit requirement</i> !!style="text-align: left; background: transparent;"|'''<i>Schedule</i> | !style="text-align: left; background: transparent;"|'''<i>Permit requirement</i> !!style="text-align: left; background: transparent;"|'''<i>Schedule</i> | ||
|- | |- | ||
− | | Section 12. Stormwater Pollution Prevention Program (SWPPP)<br/>Document | + | | '''Section 12. Stormwater Pollution Prevention Program (SWPPP)<br/>Document''' |
*<i>Submit the SWPPP Document completed in accordance with<br/>Section 12 | *<i>Submit the SWPPP Document completed in accordance with<br/>Section 12 | ||
| | | | ||
*Within 150 days after General Permit issuance<br/>date. | *Within 150 days after General Permit issuance<br/>date. | ||
|- | |- | ||
− | | Section 13. Stormwater Pollution Prevention Program (SWPPP) | + | |'''Section 13. Stormwater Pollution Prevention Program (SWPPP)''' |
*<i>Complete revisions to incorporate the new requirements of<br/>Sections 14 - 23 into current SWPPP. | *<i>Complete revisions to incorporate the new requirements of<br/>Sections 14 - 23 into current SWPPP. | ||
| | | | ||
*Within 12 months of the date General Permit<br/>coverage is extended, unless other timelines have<br/>been specifically established in the General Permit<br/>and identified below. | *Within 12 months of the date General Permit<br/>coverage is extended, unless other timelines have<br/>been specifically established in the General Permit<br/>and identified below. | ||
|- | |- | ||
− | |Section 19. Construction Site Stormwater Runoff Control | + | |'''Section 19. Construction Site Stormwater Runoff Control''' |
*<i>Complete revisions to Construction Site Stormwater Runoff<br/>Control program, including revisions to regulatory mechanism(s),<br/>if necessary. | *<i>Complete revisions to Construction Site Stormwater Runoff<br/>Control program, including revisions to regulatory mechanism(s),<br/>if necessary. | ||
*<i>When the CSW Permit is reissued, revise regulatory<br/>mechanism(s), if necessary, to be at least as stringent as the<br/>requirements for erosion, sediment, and waste controls described<br/>in the CSW Permit. | *<i>When the CSW Permit is reissued, revise regulatory<br/>mechanism(s), if necessary, to be at least as stringent as the<br/>requirements for erosion, sediment, and waste controls described<br/>in the CSW Permit. | ||
Line 22: | Line 22: | ||
*Within 12 months of the issuance date of the CSW<br/>Permit (expected issuance date of the CSW Permit<br/>is August 1, 2023). | *Within 12 months of the issuance date of the CSW<br/>Permit (expected issuance date of the CSW Permit<br/>is August 1, 2023). | ||
|- | |- | ||
− | |Section 21. Pollution Prevention/Good Housekeeping for<br/>Municipal Operations | + | |'''Section 21. Pollution Prevention/Good Housekeeping for<br/>Municipal Operations''' |
*<i>Conduct structural stormwater best management practice (BMP)<br/>inspections. | *<i>Conduct structural stormwater best management practice (BMP)<br/>inspections. | ||
*<i>Conduct pond and outfall inspections | *<i>Conduct pond and outfall inspections | ||
Line 29: | Line 29: | ||
*Prior to the expiration date of the General Permit. | *Prior to the expiration date of the General Permit. | ||
|- | |- | ||
− | |Section 22. Discharges to Impaired Waters with a USEPA-<br/>Approved TMDL that includes an Applicable WLA | + | |'''Section 22. Discharges to Impaired Waters with a USEPA-<br/>Approved TMDL that includes an Applicable WLA''' |
*<i>Submit all information required in item 22.2. | *<i>Submit all information required in item 22.2. | ||
*<i>Meet requirements for applicable WLAs for bacteria, chloride,<br/>and temperature in Section 22. | *<i>Meet requirements for applicable WLAs for bacteria, chloride,<br/>and temperature in Section 22. | ||
Line 37: | Line 37: | ||
coverage is extended. | coverage is extended. | ||
|- | |- | ||
− | |Section 25. Annual Assessment, Annual Reporting, and<br/>Recordkeeping | + | |'''Section 25. Annual Assessment, Annual Reporting, and<br/>Recordkeeping''' |
*<i>Conduct assessment of the SWPPP. | *<i>Conduct assessment of the SWPPP. | ||
*<i>On a form provided by the Agency, submit an annual report. | *<i>On a form provided by the Agency, submit an annual report. |
Permit requirement | Schedule |
---|---|
Section 12. Stormwater Pollution Prevention Program (SWPPP) Document
|
|
Section 13. Stormwater Pollution Prevention Program (SWPPP)
|
|
Section 19. Construction Site Stormwater Runoff Control
|
|
Section 21. Pollution Prevention/Good Housekeeping for Municipal Operations
|
|
Section 22. Discharges to Impaired Waters with a USEPA- Approved TMDL that includes an Applicable WLA
|
coverage is extended. |
Section 25. Annual Assessment, Annual Reporting, and Recordkeeping
|
|