m
m
Line 1: Line 1:
<font size=3>'''Recommended number of soil borings, pits and permeameter tests for bioretention design.'''</font size><br>
+
<font size=3>'''Recommended number of soil borings, pits or permeameter tests for bioretention design. Designers select one of these methods.'''</font size><br>
 
Link to this [[Recommended number of soil boring, pits, and permeameter tests for bioretention design|table]]
 
Link to this [[Recommended number of soil boring, pits, and permeameter tests for bioretention design|table]]
  

Revision as of 14:54, 24 April 2014

Recommended number of soil borings, pits or permeameter tests for bioretention design. Designers select one of these methods.
Link to this table

Surface area of stormwater control measure (BMP)(ft2) Borings Pits Permeameter tests
< 1000 1 1 5
1000 to 5000 2 2 10
5000 to 10000 3 3 15
>10000 41 41 202

1an additional soil boring or pit should be completed for each additional 2,500 ft2 above 12,500 ft2
2an additional five permeameter tests should be completed for each additional 5,000 ft2 above 15,000 ft2