(Created page with "<font size=3>'''Sequence of events and type of personnel resources to help green stormwater infrastructure planners ([https://cvc.ca/wp-content/uploads/2014/04/LID-SWM-Guide-v...")
 
m
 
(2 intermediate revisions by the same user not shown)
Line 9: Line 9:
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>1.:Use available information from regional, watershed and subwatershed scale studies to develop an understanding of the environmental contexts in which the site is located and the watershed management objectives and targets relevant to the site (e.g., stormwater management, natural heritage system and aquatic community objectives/targets).</th>
+
<td>1.Use available information from regional, watershed and subwatershed scale studies to develop an understanding of the environmental contexts in which the site is located and the watershed management objectives and targets relevant to the site (e.g., stormwater management, natural heritage system and aquatic community objectives/targets).</td>
<th>Engineer or scientist familiar with the area and its environmental context, and who has GSI expertise</th>
+
<td>Engineer or scientist familiar with the area and its environmental context, and who has GSI expertise</td>
<th>*[http://bwsr.state.mn.us/swcd-comprehensive-plans SWCD Comprehensive Plans]
+
<td>
 +
*[http://bwsr.state.mn.us/swcd-comprehensive-plans SWCD Comprehensive Plans]
 
*[http://bwsr.state.mn.us/one-watershed-one-plan One Watershed, One Plan]
 
*[http://bwsr.state.mn.us/one-watershed-one-plan One Watershed, One Plan]
 
*[http://bwsr.state.mn.us/watershed-district-management-plan-non-metro Watershed District Management Plan]
 
*[http://bwsr.state.mn.us/watershed-district-management-plan-non-metro Watershed District Management Plan]
Line 19: Line 20:
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>2.:Undertake a comprehensive inventory of the biophysical, ecological, and hydrological characteristics of the site.</td>
+
<td>2.Undertake a comprehensive inventory of the biophysical, ecological, and hydrological characteristics of the site.</td>
 
<td>Biologist, ecologist, hydrologist, or similar</td>
 
<td>Biologist, ecologist, hydrologist, or similar</td>
<td>*EPA EnviroAtlas: https://www.epa.gov/enviroatlas  
+
<td>
 +
*EPA EnviroAtlas: https://www.epa.gov/enviroatlas  
 
*[https://www.epa.gov/waterdata/surf-your-watershed EPA surf your watershed]
 
*[https://www.epa.gov/waterdata/surf-your-watershed EPA surf your watershed]
 
*[https://www.ncdc.noaa.gov/cdo-web/ NOAA Climate Data]
 
*[https://www.ncdc.noaa.gov/cdo-web/ NOAA Climate Data]
Line 30: Line 32:
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>3.:Identify existing terrestrial and aquatic natural heritage features and functions that require protection as the basis for a natural heritage system. </td>
+
<td>3.Identify existing terrestrial and aquatic natural heritage features and functions that require protection as the basis for a natural heritage system. </td>
 
<td>Biologist or ecologist with terrestrial and aquatic expertise</td>
 
<td>Biologist or ecologist with terrestrial and aquatic expertise</td>
<td>*[https://www.dnr.state.mn.us/nhnrp/nhis.html MNDNR Natural Heritage Information System]</td>
+
<td>
 +
*[https://www.dnr.state.mn.us/nhnrp/nhis.html MNDNR Natural Heritage Information System]</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>4.:Identify opportunities to enhance features, connectivity, and functional integrity of the natural heritage system.</td>
+
<td>4.Identify opportunities to enhance features, connectivity, and functional integrity of the natural heritage system.</td>
 
<td>Engineer or scientist</td>
 
<td>Engineer or scientist</td>
 
<td></td>
 
<td></td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>5.:Identify soil and hydrogeologic conditions that are well-suited for stormwater infiltration practices. </td>
+
<td>5.Identify soil and hydrogeologic conditions that are well-suited for stormwater infiltration practices. </td>
 
<td>Hydrologist, geologist, soil scientist, geotechnical engineer, or similar</td>
 
<td>Hydrologist, geologist, soil scientist, geotechnical engineer, or similar</td>
<td>*[https://websoilsurvey.sc.egov.usda.gov/App/WebSoilSurvey.aspx United States Department of Agriculture (USDA) Web Soil Survey]
+
<td>
 +
*[https://websoilsurvey.sc.egov.usda.gov/App/WebSoilSurvey.aspx United States Department of Agriculture (USDA) Web Soil Survey]
 
*[https://www.mngeo.state.mn.us/chouse/soil.html MNDNR Digital Soil Mapping]
 
*[https://www.mngeo.state.mn.us/chouse/soil.html MNDNR Digital Soil Mapping]
 
</td>
 
</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>6.:Identify patterns of shallow groundwater flow and locations of discharge to receiving watercourses or wetlands within or adjacent to the limits of the site.</td>
+
<td>6.Identify patterns of shallow groundwater flow and locations of discharge to receiving watercourses or wetlands within or adjacent to the limits of the site.</td>
 
<td>Hydrologist, geologist, or similar</td>
 
<td>Hydrologist, geologist, or similar</td>
<td>*[http://bwsr.state.mn.us/metro-county-groundwater-plan Metro County Groundwater Plan]
+
<td>
 +
*[http://bwsr.state.mn.us/metro-county-groundwater-plan Metro County Groundwater Plan]
 
*[https://www.dnr.state.mn.us/eco/wetlands/nwi_proj.html MNDNR National Wetlands Inventory Update]
 
*[https://www.dnr.state.mn.us/eco/wetlands/nwi_proj.html MNDNR National Wetlands Inventory Update]
 
</td>
 
</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>7.:Identify strategic and desirable locations for stormwater management practices (SWMPs) and the nature and function of facilities (e.g., attenuation, infiltration, filtration, evapotranspiration, harvesting, etc.).</td>
+
<td>7.Identify strategic and desirable locations for stormwater management practices (SWMPs) and the nature and function of facilities (e.g., attenuation, infiltration, filtration, evapotranspiration, harvesting, etc.).</td>
 
<td>Engineer or scientist with GSI expertise</td>
 
<td>Engineer or scientist with GSI expertise</td>
 
<td>[https://www.epa.gov/water-research/green-infrastructure-modeling-toolkit EPA GSI Modeling Toolkit]</td>
 
<td>[https://www.epa.gov/water-research/green-infrastructure-modeling-toolkit EPA GSI Modeling Toolkit]</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>8.:Identify a long list of opportunities to integrate desirable SWMPs into components of the community or built form. </td>
+
<td>8.Identify a long list of opportunities to integrate desirable SWMPs into components of the community or built form. </td>
 
<td>Planner or landscape architect with GSI expertise</td>
 
<td>Planner or landscape architect with GSI expertise</td>
 
<td></td>
 
<td></td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>9.:Explore a full range of design options for the community that can achieve stormwater management objectives in conjunction with other community design objectives.</td>
+
<td>9.Explore a full range of design options for the community that can achieve stormwater management objectives in conjunction with other community design objectives.</td>
 
<td>Planner or landscape architect with GSI expertise</td>
 
<td>Planner or landscape architect with GSI expertise</td>
 
<td></td>
 
<td></td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>10.:Develop the community design plan</td>
+
<td>10.Develop the community design plan</td>
 
<td>Planner or landscape architect with GSI expertise</td>
 
<td>Planner or landscape architect with GSI expertise</td>
 
<td></td>
 
<td></td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>11.:Resolve the design of the stormwater management strategy including defining the SWMPs to be incorporated into the design of specific components of the development and establish specific design and performance criteria for each practice.</td>
+
<td>11.Resolve the design of the stormwater management strategy including defining the SWMPs to be incorporated into the design of specific components of the development and establish specific design and performance criteria for each practice.</td>
 
<td>Engineer or scientist with GSI expertise</td>
 
<td>Engineer or scientist with GSI expertise</td>
 
<td></td>
 
<td></td>
 
</tr>
 
</tr>
 
</table>
 
</table>
 +
 +
[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Green infrastructure]]

Latest revision as of 22:45, 8 December 2022

Sequence of events and type of personnel resources to help green stormwater infrastructure planners (Credit Valley Conservation and Toronto and Region Conservation Authority, 2010).
Link to this table

Planning and design step Examples of Helpful Personnel Resources Helpful Publicly Available Technical Resources (Non-Exhaustive)
1.Use available information from regional, watershed and subwatershed scale studies to develop an understanding of the environmental contexts in which the site is located and the watershed management objectives and targets relevant to the site (e.g., stormwater management, natural heritage system and aquatic community objectives/targets). Engineer or scientist familiar with the area and its environmental context, and who has GSI expertise
2.Undertake a comprehensive inventory of the biophysical, ecological, and hydrological characteristics of the site. Biologist, ecologist, hydrologist, or similar
3.Identify existing terrestrial and aquatic natural heritage features and functions that require protection as the basis for a natural heritage system. Biologist or ecologist with terrestrial and aquatic expertise
4.Identify opportunities to enhance features, connectivity, and functional integrity of the natural heritage system. Engineer or scientist
5.Identify soil and hydrogeologic conditions that are well-suited for stormwater infiltration practices. Hydrologist, geologist, soil scientist, geotechnical engineer, or similar
6.Identify patterns of shallow groundwater flow and locations of discharge to receiving watercourses or wetlands within or adjacent to the limits of the site. Hydrologist, geologist, or similar
7.Identify strategic and desirable locations for stormwater management practices (SWMPs) and the nature and function of facilities (e.g., attenuation, infiltration, filtration, evapotranspiration, harvesting, etc.). Engineer or scientist with GSI expertise EPA GSI Modeling Toolkit
8.Identify a long list of opportunities to integrate desirable SWMPs into components of the community or built form. Planner or landscape architect with GSI expertise
9.Explore a full range of design options for the community that can achieve stormwater management objectives in conjunction with other community design objectives. Planner or landscape architect with GSI expertise
10.Develop the community design plan Planner or landscape architect with GSI expertise
11.Resolve the design of the stormwater management strategy including defining the SWMPs to be incorporated into the design of specific components of the development and establish specific design and performance criteria for each practice. Engineer or scientist with GSI expertise

This page was last edited on 8 December 2022, at 22:45.