m
m
 
(One intermediate revision by the same user not shown)
Line 72: Line 72:
  
 
</table>
 
</table>
 
+
<noinclude>
[[category:Table]]
+
[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Chloride, salt management]]
 +
</noinclude>

Latest revision as of 15:45, 4 August 2022

Step 2 Calibration Chart for auger or conveyor systems
Link to this table

Date: August 8, 2015
Spreader #: A4219
Material: Rock salt
Setting Pounds per minute 5 mph (X12) 10 mph (X6) 15 mph (X4) 20 mph (X3)
1 10
2 22
3 34

This page was last edited on 4 August 2022, at 15:45.