m
m
Line 24: Line 24:
 
<td rowspan=2>1</td>
 
<td rowspan=2>1</td>
 
<td rowspan=2>  10  </td>
 
<td rowspan=2>  10  </td>
<td>    * 120        </td>
+
<td>    120<sup>1</sup>       </td>
 
<td>    60    </td>
 
<td>    60    </td>
 
<td>    40  </td>
 
<td>    40  </td>
Line 31: Line 31:
  
 
<tr>
 
<tr>
<td>  ** </td>
+
<td>  <sup>2</sup> </td>
 
<td>        </td>
 
<td>        </td>
 
<td>          </td>
 
<td>          </td>
Line 68: Line 68:
 
</table>
 
</table>
 
<font size=1>
 
<font size=1>
*top half of each row = lbs/lane mile.  To get this number, multiply lbs/min by the factor shown for each speed
+
<sup>1</sup>top half of each row = lbs/lane mile.  To get this number, multiply lbs/min by the factor shown for each speed<br>
**bottom half of each row = lbs/1000 sq ft.  To find this, divide the number in the top half by 63</font size>
+
<sup>2</sup>bottom half of each row = lbs/1000 sq ft.  To find this, divide the number in the top half by 63</font size>
  
 
[[category:Table]]
 
[[category:Table]]

Revision as of 21:28, 26 February 2016

Step 3 Calibration Chart for auger or conveyor systems
Link to this table

Date: August 8, 2015
Spreader #: A4219
Material: Rock salt
Setting Pounds per minute 5 mph (X12) 10 mph (X6) 15 mph (X4) 20 mph (X3)
1 10 1201 60 40 30
2
2 22 264 132 88 66
3 34 408 204 136 102

1top half of each row = lbs/lane mile. To get this number, multiply lbs/min by the factor shown for each speed
2bottom half of each row = lbs/1000 sq ft. To find this, divide the number in the top half by 63