(Created page with "<center><font size=3>'''Step 3 Calibration Chart for auger or conveyor systems'''</font size><br> Link to this [[Step 3 Calibration Chart for auger or conveyor systems|table]...")
 
m
 
(9 intermediate revisions by 2 users not shown)
Line 1: Line 1:
<center><font size=3>'''Step 3 Calibration Chart for auger or conveyor systems'''</font size><br>
+
<font size=3>'''Step 3 Calibration chart for auger or conveyor systems'''</font size><br>
 
+
Link to this [[Step 3 Calibration Chart for auger or conveyor systems|table]]
Link to this [[Step 3 Calibration Chart for auger or conveyor systems|table]]</center>
 
 
 
Date ___Aug 8 2015___________
 
 
 
Spreader # ____A4219______
 
 
 
Material ___Rock Salt____________
 
 
 
  
 
<table class="sortable">
 
<table class="sortable">
 +
<tr>
 +
<td colspan=6>Date: August 8, 2015</td>
 +
</tr>
 +
<tr>
 +
<td colspan=6>Spreader #: A4219</td>
 +
</tr>
 +
<tr>
 +
<td colspan=6>Material: Rock salt</td>
 +
</tr>
 
<tr>
 
<tr>
 
<th>Setting</th>
 
<th>Setting</th>
Line 23: Line 24:
 
<td rowspan=2>1</td>
 
<td rowspan=2>1</td>
 
<td rowspan=2>  10  </td>
 
<td rowspan=2>  10  </td>
<td>    * 120        </td>
+
<td>    120<sup>1</sup>       </td>
 
<td>    60    </td>
 
<td>    60    </td>
 
<td>    40  </td>
 
<td>    40  </td>
Line 30: Line 31:
  
 
<tr>
 
<tr>
<td>  ** </td>
+
<td>  <sup>2</sup> </td>
 
<td>        </td>
 
<td>        </td>
 
<td>          </td>
 
<td>          </td>
Line 51: Line 52:
 
<td>          </td>
 
<td>          </td>
 
</tr>
 
</tr>
 
 
 
<tr>
 
<tr>
 
<td rowspan=2>3</td>
 
<td rowspan=2>3</td>
Line 61: Line 60:
 
<td>  102  </td>
 
<td>  102  </td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>    </td>
 
<td>    </td>
Line 68: Line 66:
 
<td>      </td>
 
<td>      </td>
 
</tr>
 
</tr>
 
 
 
</table>
 
</table>
 +
<font size=1>
 +
<sup>1</sup> top half of each row = lbs/lane mile.  To get this number, multiply lbs/min by the factor shown for each speed<br>
 +
<sup>2</sup> bottom half of each row = lbs/1000 sq ft.  To find this, divide the number in the top half by 63</font size>
  
'''*top half of each row = lbs/lane mile.  To get this number, multiply lbs/min by the factor shown for each speed
+
<noinclude>
''**bottom half of each row = lbs/1000 sq ft.  To find this, divide the number in the top half by 63
+
[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Chloride, salt management]]
 
+
</noinclude>
[[category:Table]]
 

Latest revision as of 15:46, 4 August 2022

Step 3 Calibration chart for auger or conveyor systems
Link to this table

Date: August 8, 2015
Spreader #: A4219
Material: Rock salt
Setting Pounds per minute 5 mph (X12) 10 mph (X6) 15 mph (X4) 20 mph (X3)
1 10 1201 60 40 30
2
2 22 264 132 88 66
3 34 408 204 136 102

1 top half of each row = lbs/lane mile. To get this number, multiply lbs/min by the factor shown for each speed
2 bottom half of each row = lbs/1000 sq ft. To find this, divide the number in the top half by 63

This page was last edited on 4 August 2022, at 15:46.