m |
m |
||
(6 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | <font size=3>'''Step 3 Calibration | + | <font size=3>'''Step 3 Calibration chart for auger or conveyor systems'''</font size><br> |
Link to this [[Step 3 Calibration Chart for auger or conveyor systems|table]] | Link to this [[Step 3 Calibration Chart for auger or conveyor systems|table]] | ||
Line 24: | Line 24: | ||
<td rowspan=2>1</td> | <td rowspan=2>1</td> | ||
<td rowspan=2> 10 </td> | <td rowspan=2> 10 </td> | ||
− | <td> | + | <td> 120<sup>1</sup> </td> |
<td> 60 </td> | <td> 60 </td> | ||
<td> 40 </td> | <td> 40 </td> | ||
Line 31: | Line 31: | ||
<tr> | <tr> | ||
− | <td> | + | <td> <sup>2</sup> </td> |
<td> </td> | <td> </td> | ||
<td> </td> | <td> </td> | ||
Line 52: | Line 52: | ||
<td> </td> | <td> </td> | ||
</tr> | </tr> | ||
− | |||
− | |||
<tr> | <tr> | ||
<td rowspan=2>3</td> | <td rowspan=2>3</td> | ||
Line 62: | Line 60: | ||
<td> 102 </td> | <td> 102 </td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td> </td> | <td> </td> | ||
Line 69: | Line 66: | ||
<td> </td> | <td> </td> | ||
</tr> | </tr> | ||
− | |||
− | |||
</table> | </table> | ||
+ | <font size=1> | ||
+ | <sup>1</sup> top half of each row = lbs/lane mile. To get this number, multiply lbs/min by the factor shown for each speed<br> | ||
+ | <sup>2</sup> bottom half of each row = lbs/1000 sq ft. To find this, divide the number in the top half by 63</font size> | ||
− | + | <noinclude> | |
− | + | [[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Chloride, salt management]] | |
− | + | </noinclude> | |
− | |||
− |
Step 3 Calibration chart for auger or conveyor systems
Link to this table
Date: August 8, 2015 | |||||
Spreader #: A4219 | |||||
Material: Rock salt | |||||
Setting | Pounds per minute | 5 mph (X12) | 10 mph (X6) | 15 mph (X4) | 20 mph (X3) |
---|---|---|---|---|---|
1 | 10 | 1201 | 60 | 40 | 30 |
2 | |||||
2 | 22 | 264 | 132 | 88 | 66 |
3 | 34 | 408 | 204 | 136 | 102 |
1 top half of each row = lbs/lane mile. To get this number, multiply lbs/min by the factor shown for each speed
2 bottom half of each row = lbs/1000 sq ft. To find this, divide the number in the top half by 63
This page was last edited on 4 August 2022, at 15:46.