(Created page with " <center><font size=3>'''This table shows Stormwater pond/ wetland - construction inspection checklist.'''</font size><br> Link to this [[Stormwater pond/ wetland - constru...")
 
m
Line 1: Line 1:
  
+
 
  
 
<center><font size=3>'''This table shows Stormwater pond/ wetland - construction inspection checklist.'''</font size><br>
 
<center><font size=3>'''This table shows Stormwater pond/ wetland - construction inspection checklist.'''</font size><br>
Line 35: Line 35:
 
<tr>
 
<tr>
 
<td>Pre-construction meeting</td>
 
<td>Pre-construction meeting</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Pipe and appurtenances on-site prior to construction and dimensions checked</td>
 
<td>Pipe and appurtenances on-site prior to construction and dimensions checked</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>1. Material (including protective coating, if specified)</td>
 
<td>1. Material (including protective coating, if specified)</td>
<td>   </td>
+
<td> </td>
<td>   X</td>
+
<td> X</td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>2. Diameter</td>
 
<td>2. Diameter</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>3. Dimensions of metal riser or pre-cast concrete outlet structure</td>
 
<td>3. Dimensions of metal riser or pre-cast concrete outlet structure</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>4. Required dimensions between water control structures (orifices, weirs, etc.) are in accordance with approved plans</td>
 
<td>4. Required dimensions between water control structures (orifices, weirs, etc.) are in accordance with approved plans</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>5. Barrel stub for prefabricated pipe structures at proper angle for design barrel slope</td>
 
<td>5. Barrel stub for prefabricated pipe structures at proper angle for design barrel slope</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>6. Number and dimensions of prefabricated antiseep collars</td>
 
<td>6. Number and dimensions of prefabricated antiseep collars</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>7. Watertight connectors and gaskets</td>
 
<td>7. Watertight connectors and gaskets</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>8. Outlet drain valve</td>
 
<td>8. Outlet drain valve</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Project benchmark near pond site</td>
 
<td>Project benchmark near pond site</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>X</td>
 
<td>X</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Facility location staked out</td>
 
<td>Facility location staked out</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Equipment for temporary de-watering</td>
 
<td>Equipment for temporary de-watering</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Temporary erosion and sediment control in place</td>
 
<td>Temporary erosion and sediment control in place</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
Line 130: Line 130:
 
<tr>
 
<tr>
 
<td>Area beneath embankment stripped of all vegetation, topsoil, and organic matter</td>
 
<td>Area beneath embankment stripped of all vegetation, topsoil, and organic matter</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
Line 139: Line 139:
 
<tr>
 
<tr>
 
<td>Method of installation detailed on plans</td>
 
<td>Method of installation detailed on plans</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
Line 149: Line 149:
 
<tr>
 
<tr>
 
<td>Installation trench excavated with specified side slopes</td>
 
<td>Installation trench excavated with specified side slopes</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Stable, uniform, dry subgrade of relatively impervious material (If subgrade is wet, contractor shall have defined steps before proceeding with installation)</td>
 
<td>Stable, uniform, dry subgrade of relatively impervious material (If subgrade is wet, contractor shall have defined steps before proceeding with installation)</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Invert at proper elevation and grade</td>
 
<td>Invert at proper elevation and grade</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
Line 171: Line 171:
 
<tr>
 
<tr>
 
<td>Metal / plastic pipe</td>
 
<td>Metal / plastic pipe</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>1. Watertight connectors and gaskets properly installed</td>
 
<td>1. Watertight connectors and gaskets properly installed</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>2. Anti-seep collars properly spaced and having watertight connections to pipe</td>
 
<td>2. Anti-seep collars properly spaced and having watertight connections to pipe</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>3. Backfill placed and tamped by hand under “haunches” of pipe</td>
 
<td>3. Backfill placed and tamped by hand under “haunches” of pipe</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>4. Remaining backfill placed in max. 8 inch lifts using small power tamping equipment until 2 feet cover over pipe is reached</td>
 
<td>4. Remaining backfill placed in max. 8 inch lifts using small power tamping equipment until 2 feet cover over pipe is reached</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
Line 205: Line 205:
 
<tr>
 
<tr>
 
<td>1. Pipe set on blocks or concrete slab for pouring of low cradle</td>
 
<td>1. Pipe set on blocks or concrete slab for pouring of low cradle</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>2. Pipe installed with rubber gasket joints with no spalling in gasket interface area</td>
 
<td>2. Pipe installed with rubber gasket joints with no spalling in gasket interface area</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>3. Excavation for lower half of anti-seep collar(s) with reinforcing steel set</td>
 
<td>3. Excavation for lower half of anti-seep collar(s) with reinforcing steel set</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>4. Entire area where anti-seep collar(s) will come in contact with pipe coated with mastic or other approved waterproof sealant</td>
 
<td>4. Entire area where anti-seep collar(s) will come in contact with pipe coated with mastic or other approved waterproof sealant</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>5. Low cradle and bottom half of anti-seep collar installed as monolithic pour and of an approved mix</td>
 
<td>5. Low cradle and bottom half of anti-seep collar installed as monolithic pour and of an approved mix</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>6. Upper half of anti-seep collar(s) formed with reinforcing steel set</td>
 
<td>6. Upper half of anti-seep collar(s) formed with reinforcing steel set</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>7. Concrete for collar of an approved mix and vibrated into place (protected from freezing while curing, if necessary)</td>
 
<td>7. Concrete for collar of an approved mix and vibrated into place (protected from freezing while curing, if necessary)</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>8. Forms stripped and collar inspected for honeycomb prior to backfilling. Parge if necessary.</td>
 
<td>8. Forms stripped and collar inspected for honeycomb prior to backfilling. Parge if necessary.</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
Line 256: Line 256:
 
<tr>
 
<tr>
 
<td>Fill placed in maximum 8 inch lifts</td>
 
<td>Fill placed in maximum 8 inch lifts</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Backfill taken minimum 2 feet above top of antiseep collar elevation before traversing with heavy equipment</td>
 
<td>Backfill taken minimum 2 feet above top of antiseep collar elevation before traversing with heavy equipment</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
Line 272: Line 272:
 
<tr>
 
<tr>
 
<td>Riser located within embankment</td>
 
<td>Riser located within embankment</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
Line 281: Line 281:
 
<tr>
 
<tr>
 
<td>Riser base excavated or formed on stable subgrade to design dimensions</td>
 
<td>Riser base excavated or formed on stable subgrade to design dimensions</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Set on blocks to design elevations and plumbed</td>
 
<td>Set on blocks to design elevations and plumbed</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Reinforcing bars placed at right angles and projecting into sides of riser</td>
 
<td>Reinforcing bars placed at right angles and projecting into sides of riser</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Concrete poured so as to fill inside of riser to invert of barrel</td>
 
<td>Concrete poured so as to fill inside of riser to invert of barrel</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
Line 307: Line 307:
 
<tr>
 
<tr>
 
<td>Dry and stable subgrade</td>
 
<td>Dry and stable subgrade</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Riser base set to design elevation</td>
 
<td>Riser base set to design elevation</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>If more than one section, no spalling in gasket interface area; gasket or approved caulking material placed securely</td>
 
<td>If more than one section, no spalling in gasket interface area; gasket or approved caulking material placed securely</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Watertight and structurally sound collar or gasket joint where structure connects to pipe spillway</td>
 
<td>Watertight and structurally sound collar or gasket joint where structure connects to pipe spillway</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
Line 335: Line 335:
 
<tr>
 
<tr>
 
<td>Footing excavated or formed on stable subgrade, to design dimensions with reinforcing steel set</td>
 
<td>Footing excavated or formed on stable subgrade, to design dimensions with reinforcing steel set</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Structure formed to design dimensions, with reinforcing steel set as per plan</td>
 
<td>Structure formed to design dimensions, with reinforcing steel set as per plan</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Concrete of an approved mix and vibrated into place (protected from freezing while curing, if necessary)</td>
 
<td>Concrete of an approved mix and vibrated into place (protected from freezing while curing, if necessary)</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Forms stripped & inspected for honeycomb prior to backfilling; parge if necessary</td>
 
<td>Forms stripped & inspected for honeycomb prior to backfilling; parge if necessary</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
Line 363: Line 363:
 
<tr>
 
<tr>
 
<td>Fill material</td>
 
<td>Fill material</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Compaction</td>
 
<td>Compaction</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
Line 379: Line 379:
 
<tr>
 
<tr>
 
<td>1. Fill placed in specified lifts and compacted with appropriate equipment</td>
 
<td>1. Fill placed in specified lifts and compacted with appropriate equipment</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>2. Constructed to design cross-section, side slopes and top width</td>
 
<td>2. Constructed to design cross-section, side slopes and top width</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>3. Constructed to design elevation plus allowance for settlement</td>
 
<td>3. Constructed to design elevation plus allowance for settlement</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
Line 401: Line 401:
 
<tr>
 
<tr>
 
<td>Excavated / graded to design contours and side slopes</td>
 
<td>Excavated / graded to design contours and side slopes</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Inlet pipes have adequate outfall protection</td>
 
<td>Inlet pipes have adequate outfall protection</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Forebay(s) constructed per plans</td>
 
<td>Forebay(s) constructed per plans</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Pond benches construction per plans</td>
 
<td>Pond benches construction per plans</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
Line 426: Line 426:
 
<tr>
 
<tr>
 
<td>Spillway located in cut or structurally stabilized with riprap, gabions, concrete, etc.</td>
 
<td>Spillway located in cut or structurally stabilized with riprap, gabions, concrete, etc.</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Excavated to proper cross-section, side slopes and bottom width</td>
 
<td>Excavated to proper cross-section, side slopes and bottom width</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Entrance channel, crest, and exit channel constructed to design grades and elevations</td>
 
<td>Entrance channel, crest, and exit channel constructed to design grades and elevations</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
Line 451: Line 451:
 
<tr>
 
<tr>
 
<td>Securely in place and properly backfilled</td>
 
<td>Securely in place and properly backfilled</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
Line 460: Line 460:
 
<tr>
 
<tr>
 
<td>Footing excavated or formed on stable subgrade, to design dimensions and reinforcing steel set, if specified</td>
 
<td>Footing excavated or formed on stable subgrade, to design dimensions and reinforcing steel set, if specified</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Endwall formed to design dimensions with reinforcing steel set as per plan</td>
 
<td>Endwall formed to design dimensions with reinforcing steel set as per plan</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Concrete of an approved mix and vibrated into place (protected from freezing, if necessary)</td>
 
<td>Concrete of an approved mix and vibrated into place (protected from freezing, if necessary)</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Forms stripped and structure inspected for honeycomb prior to backfilling; parge if necessary</td>
 
<td>Forms stripped and structure inspected for honeycomb prior to backfilling; parge if necessary</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
tr>
+
<tr>
 
<td colspan=3>C. Riprap apron / channel</td>
 
<td colspan=3>C. Riprap apron / channel</td>
 
</tr>
 
</tr>
Line 488: Line 488:
 
<tr>
 
<tr>
 
<td>Apron / channel excavated to design cross-section with proper transition to existing ground</td>
 
<td>Apron / channel excavated to design cross-section with proper transition to existing ground</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Filter fabric in place</td>
 
<td>Filter fabric in place</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Stone sized as per plan and uniformly place at the thickness specified</td>
 
<td>Stone sized as per plan and uniformly place at the thickness specified</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
Line 510: Line 510:
 
<tr>
 
<tr>
 
<td>X</td>
 
<td>X</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Approved seed mixture or sod</td>
 
<td>Approved seed mixture or sod</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Proper surface preparation and required soil mendments</td>
 
<td>Proper surface preparation and required soil mendments</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Excelsior mat or other stabilization, as per plan</td>
 
<td>Excelsior mat or other stabilization, as per plan</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
Line 538: Line 538:
 
<tr>
 
<tr>
 
<td>Drain for ponds having a permanent pool</td>
 
<td>Drain for ponds having a permanent pool</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Trash rack / anti-vortex device secured to outlet structure</td>
 
<td>Trash rack / anti-vortex device secured to outlet structure</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Trash protection for low flow pipes, orifices, etc.</td>
 
<td>Trash protection for low flow pipes, orifices, etc.</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Fencing (when required)</td>
 
<td>Fencing (when required)</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
+
 
  
 
<tr>
 
<tr>
 
<td>Access road</td>
 
<td>Access road</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Set aside for clean-out maintenance</td>
 
<td>Set aside for clean-out maintenance</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
Line 580: Line 580:
 
<tr>
 
<tr>
 
<td>Adequate water balance</td>
 
<td>Adequate water balance</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Variety of depth zones present</td>
 
<td>Variety of depth zones present</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Approved pondscaping plan in place and budget for additional plantings</td>
 
<td>Approved pondscaping plan in place and budget for additional plantings</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Plants and materials ordered 6 months prior to construction</td>
 
<td>Plants and materials ordered 6 months prior to construction</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Construction planned to allow for adequate planting and establishment of plant community (April-June planting window)</td>
 
<td>Construction planned to allow for adequate planting and establishment of plant community (April-June planting window)</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
Line 614: Line 614:
 
<tr>
 
<tr>
 
<td>Construction sediment removed from settling basin</td>
 
<td>Construction sediment removed from settling basin</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Contributing drainage area stabilized</td>
 
<td>Contributing drainage area stabilized</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Vegetation established per specifications</td>
 
<td>Vegetation established per specifications</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Inlet and outlet structures operational</td>
 
<td>Inlet and outlet structures operational</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  

Revision as of 20:30, 19 February 2013


This table shows Stormwater pond/ wetland - construction inspection checklist.
Link to this table


Project:
Location:
Site Status:
Date:
Time:
Inspector:
Construction Sequence Satisfactory/Unsatisfactory Comments
1. Pre-Construction/Materials and Equipment
Pre-construction meeting
Pipe and appurtenances on-site prior to construction and dimensions checked
1. Material (including protective coating, if specified) X
2. Diameter
3. Dimensions of metal riser or pre-cast concrete outlet structure
4. Required dimensions between water control structures (orifices, weirs, etc.) are in accordance with approved plans
5. Barrel stub for prefabricated pipe structures at proper angle for design barrel slope
6. Number and dimensions of prefabricated antiseep collars
7. Watertight connectors and gaskets
8. Outlet drain valve
Project benchmark near pond site
X
Facility location staked out
Equipment for temporary de-watering
Temporary erosion and sediment control in place
2. Subgrade Preparation
Area beneath embankment stripped of all vegetation, topsoil, and organic matter
3. Pipe Installation
Method of installation detailed on plans
A. Bed preparation
Installation trench excavated with specified side slopes
Stable, uniform, dry subgrade of relatively impervious material (If subgrade is wet, contractor shall have defined steps before proceeding with installation)
Invert at proper elevation and grade
B. Pipe placement
Metal / plastic pipe
1. Watertight connectors and gaskets properly installed
2. Anti-seep collars properly spaced and having watertight connections to pipe
3. Backfill placed and tamped by hand under “haunches” of pipe
4. Remaining backfill placed in max. 8 inch lifts using small power tamping equipment until 2 feet cover over pipe is reached
Concrete pipe
1. Pipe set on blocks or concrete slab for pouring of low cradle
2. Pipe installed with rubber gasket joints with no spalling in gasket interface area
3. Excavation for lower half of anti-seep collar(s) with reinforcing steel set
4. Entire area where anti-seep collar(s) will come in contact with pipe coated with mastic or other approved waterproof sealant
5. Low cradle and bottom half of anti-seep collar installed as monolithic pour and of an approved mix
6. Upper half of anti-seep collar(s) formed with reinforcing steel set
7. Concrete for collar of an approved mix and vibrated into place (protected from freezing while curing, if necessary)
8. Forms stripped and collar inspected for honeycomb prior to backfilling. Parge if necessary.
C. Backfilling
Fill placed in maximum 8 inch lifts
Backfill taken minimum 2 feet above top of antiseep collar elevation before traversing with heavy equipment
4. Riser / Outlet Structure Installation
Riser located within embankment
A. Metal riser
Riser base excavated or formed on stable subgrade to design dimensions
Set on blocks to design elevations and plumbed
Reinforcing bars placed at right angles and projecting into sides of riser
Concrete poured so as to fill inside of riser to invert of barrel
B. Pre-cast concrete structurer
Dry and stable subgrade
Riser base set to design elevation
If more than one section, no spalling in gasket interface area; gasket or approved caulking material placed securely
Watertight and structurally sound collar or gasket joint where structure connects to pipe spillway
C. Poured concrete structure
Footing excavated or formed on stable subgrade, to design dimensions with reinforcing steel set
Structure formed to design dimensions, with reinforcing steel set as per plan
Concrete of an approved mix and vibrated into place (protected from freezing while curing, if necessary)
Forms stripped & inspected for honeycomb prior to backfilling; parge if necessary
5. Embankment Construction
Fill material
Compaction
Embankment
1. Fill placed in specified lifts and compacted with appropriate equipment
2. Constructed to design cross-section, side slopes and top width
3. Constructed to design elevation plus allowance for settlement
6. Impounded Area Construction
Excavated / graded to design contours and side slopes
Inlet pipes have adequate outfall protection
Forebay(s) constructed per plans
Pond benches construction per plans
7. Earth Emergency Spillway Construction
Spillway located in cut or structurally stabilized with riprap, gabions, concrete, etc.
Excavated to proper cross-section, side slopes and bottom width
Entrance channel, crest, and exit channel constructed to design grades and elevations
8. Outlet Protection
A. End section
Securely in place and properly backfilled
B. Endwall
Footing excavated or formed on stable subgrade, to design dimensions and reinforcing steel set, if specified
Endwall formed to design dimensions with reinforcing steel set as per plan
Concrete of an approved mix and vibrated into place (protected from freezing, if necessary)
Forms stripped and structure inspected for honeycomb prior to backfilling; parge if necessary
C. Riprap apron / channel
Apron / channel excavated to design cross-section with proper transition to existing ground
Filter fabric in place
Stone sized as per plan and uniformly place at the thickness specified
9. Vegetative Stabilization
X
Approved seed mixture or sod
Proper surface preparation and required soil mendments
Excelsior mat or other stabilization, as per plan
10. Miscellaneous
Drain for ponds having a permanent pool
Trash rack / anti-vortex device secured to outlet structure
Trash protection for low flow pipes, orifices, etc.
Fencing (when required)
Access road
Set aside for clean-out maintenance
11. Stormwater Wetlands
Adequate water balance
Variety of depth zones present
Approved pondscaping plan in place and budget for additional plantings
Plants and materials ordered 6 months prior to construction
Construction planned to allow for adequate planting and establishment of plant community (April-June planting window)
12. Final Inspection
Construction sediment removed from settling basin
Contributing drainage area stabilized
Vegetation established per specifications
Inlet and outlet structures operational
Comments:




Actions to be Taken: