m
m
Line 64: Line 64:
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td> c. At or beyond toe</td>
 
<td> c. At or beyond toe</td>
Line 165: Line 164:
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td> c. Major spalling (rebars exposed)</td>
 
<td> c. Major spalling (rebars exposed)</td>
Line 181: Line 179:
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>No evidence of erosion at downstream toe</td>
 
<td>No evidence of erosion at downstream toe</td>
Line 187: Line 184:
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td> e. Water tightness</td>
 
<td> e. Water tightness</td>
Line 193: Line 189:
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>6. Metal pipe condition</td>
 
<td>6. Metal pipe condition</td>
Line 199: Line 194:
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>7. Control valve
 
<td>7. Control valve
Line 206: Line 200:
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>No evidence of erosion at downstream toe</td>
 
<td>No evidence of erosion at downstream toe</td>
Line 212: Line 205:
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td> b. Chained and locked</td>
 
<td> b. Chained and locked</td>
Line 218: Line 210:
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>8. Pond drain valve
 
<td>8. Pond drain valve
Line 225: Line 216:
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td> b. Chained and locked</td>
 
<td> b. Chained and locked</td>
Line 231: Line 221:
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>9. Outfall channels functioning</td>
 
<td>9. Outfall channels functioning</td>
Line 237: Line 226:
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>10. Other (specify)</td>
 
<td>10. Other (specify)</td>
Line 243: Line 231:
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<th colspan=3>3. Permanent Pool (Wet Ponds) (Monthly)</th>
 
<th colspan=3>3. Permanent Pool (Wet Ponds) (Monthly)</th>
Line 272: Line 259:
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<th colspan=3>4. Sediment Forebays</th>
 
<th colspan=3>4. Sediment Forebays</th>
Line 357: Line 343:
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>7. Other (specify)</td>
 
<td>7. Other (specify)</td>
Line 407: Line 392:
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<th colspan=3>8. Wetland Vegetation (Annual))</th>
 
<th colspan=3>8. Wetland Vegetation (Annual))</th>
Line 455: Line 439:
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td colspan=3>Comments:
 
<td colspan=3>Comments:
 
 
</td>
 
</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td colspan=3>Actions to be taken:
 
<td colspan=3>Actions to be taken:
 
 
 
 
</td>
 
</td>
 
</tr>
 
</tr>
 
 
 
</table>
 
</table>
  
<noinclude>[[category:table]]</noinclude>
+
<noinclude>
<noinclude>[[category:Checklist]]</noinclude>
+
[[category:Checklist]]
 +
</noinclude>

Revision as of 15:19, 15 July 2015

Stormwater pond/wetland – operation and maintenance checklist.
Link to this table
To access an Excel version of form (for field use), click here.

Project:
Location:
Site Status:
Date:
Time:
Inspector:
Maintenance Item Satisfactory / Unsatisfactory Comments
1. Embankment and emergency spillway (Annual, After Major Storms)
1. Vegetation and ground cover adequate
2. Embankment erosion
3. Animal burrows
4. Unauthorized planting
5. Cracking, bulging, or sliding of embankment
a. Upstream face
b. Downstream face
c. At or beyond toe
downstream
upstream
d. Emergency spillway
6. Pond, toe & chimney drains clear and functioning
7. Seeps/leaks on downstream face
8. Slope protection or riprap failure
9. Vertical/horizontal alignment of top of dam “As-Built”
10. Emergency spillway clear of obstructions and debris
11. Other (specify)
Riser and principal spillway (Annual)

Type: Reinforced concrete ______ Corrugated pipe ______ Masonry ______

1. Low flow orifice obstructed
N2. Low flow trash rack. a. Debris removal necessary
b. Corrosion control
3. Weir trash rack maintenance a. Debris removal necessary
4. Excessive sediment accumulation insider riser
5. Concrete/masonry condition riser and barrels a. cracks or displacement
No evidence of erosion at downstream toe
b. Minor spalling (<1” )
c. Major spalling (rebars exposed)
d. Joint failures
No evidence of erosion at downstream toe
No evidence of erosion at downstream toe
e. Water tightness
6. Metal pipe condition
7. Control valve a. Operational/exercised
No evidence of erosion at downstream toe
b. Chained and locked
8. Pond drain valve a. Operational/exercised
b. Chained and locked
9. Outfall channels functioning
10. Other (specify)
3. Permanent Pool (Wet Ponds) (Monthly)
1. Undesirable vegetative growth
2. Floating or floatable debris removal required
3. Visible pollution
4. Shoreline problem
5. Other (specify)
4. Sediment Forebays
1.Sedimentation noted
2. Sediment cleanout when depth < 50% design depth
5. Dry Pond Areas
1. Vegetation adequate
2. Undesirable vegetative growth
3. Undesirable woody vegetation
3. Undesirable woody vegetation
4. Low flow channels clear of obstructions
5. Standing water or wet spots
6. Sediment and / or trash accumulation
7. Other (specify)
6. Condition of Outfalls (Annual , After Major Storms)
1. Riprap failures
2. Slope erosion
3. Storm drain pipes
4.Endwalls / Headwalls
5. Other (specify)
7. Other (specify)
7. Other ( Monthly)
1. Encroachment on pond, wetland or easement area
2. Complaints from residents
3.Aesthetics a. Grass growing required
b. Graffiti removal neededs
c. Other (specify)
4. Conditions of maintenance access routes.
5. Signs of hydrocarbon build-up
6. Any public hazards (specify)
8. Wetland Vegetation (Annual))
1. Vegetation healthy and growing

Wetland maintaining 50% surface area coverage of wetland plants after the second growing season.

(If unsatisfactory, reinforcement plantings needed)
2. Dominant wetland plants:

Survival of desired wetland plant species

Distribution according to landscaping plan?
3. Evidence of invasive species
4. Maintenance of adequate water depths for desired wetland plant species
5. Harvesting of emergent plantings needed
6. Have sediment accumulations reduced pool volume significantly or are plants “choked” with sediment
7. Eutrophication level of the wetland.
8. Other (specify)
Comments:
Actions to be taken: