(Created page with "<center><font size=3>'''Summary of Construction Cost Data Collected'''</font size><br> Link to this table</center> <table cla...")
 
Line 8: Line 8:
 
<th>Number of BMPs</th>
 
<th>Number of BMPs</th>
 
<th>Cost per</th>
 
<th>Cost per</th>
<th>Average cost ($)</th>
+
<th>Average cost (&#128178;)</th>
 
<th>Sample standard deviation</th>
 
<th>Sample standard deviation</th>
 
</tr>
 
</tr>

Revision as of 16:34, 20 December 2017

Summary of Construction Cost Data Collected
Link to this table
BMP name Number of BMPs Cost per Average cost (💲) Sample standard deviation
Bioretention Basins 11 Water quality volume/ft3 15 9
Biofiltration Basins 2 Water quality volume/ft3 58 61
Large Wet Detention Basins treating more than 100,000 ft3 5 Water quality volume/ft3 2 2
Small Detention Basins treating less than 10,000 ft3 3 Water quality volume/ft3 145 42
Constructed Wetlands 4 Water quality volume/ft3 1 1.5
Infiltration Trenches 8 Water quality volume/ft3 11 30
Infiltration Basins 6 Water quality volume/ft3 21 15
Underground Infiltration 8 Water quality volume/ft3 213 372
Pervious Pavement 7 Water quality volume/ft3 16 8