(Created page with "<font size=3>'''Summary of quantities - stormwater step pool case study.'''</font size><br> Link to this table <ta...")
 
m
 
(3 intermediate revisions by the same user not shown)
Line 49: Line 49:
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Eart excavation</td>
+
<td>Earth excavation</td>
 
<td>Cubic yard</td>
 
<td>Cubic yard</td>
 
<td>193</td>
 
<td>193</td>
Line 114: Line 114:
 
</tr>
 
</tr>
 
</table>
 
</table>
 +
 +
<noinclude>
 +
[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Swales]]
 +
</noinclude>

Latest revision as of 16:50, 4 August 2022

Summary of quantities - stormwater step pool case study.
Link to this table

Item Unit Quantity
Riprap 6 Cubic yard 12
Riprap 5 Cubic yard 37
Riprap 3 Cubic yard 41
Riprap 1 Cubic yard 37
Limestone blocks Each 26
Grout Longitudinal section 1
Natural stone boulders (12-18 inches) Cubic yard 15
Culvert removal Linear foot 75
Earth excavation Cubic yard 193
Seeding - floodplain mix Acre 0.21
Seeding - mesic savanna mix Acre 0.11
Turf seeding Acre 0.11
Bypass pumping Longitudinal section 1
Tree removal Each 8
Brush clearing Square yard 445
Silt fencing Linear foot 325
Erosion blanket - S-75 Square yard 1017
Erosion blanket - S-150 Square yard 533
Straw mulch Square yard 533
Temporary ditch/creek check - coir log Each 2
Construction entrance Longitudinal section 1