(Created page with "<font size=3>'''Summary of quantities - stormwater step pool case study.'''</font size><br> Link to this table <ta...") |
m |
||
Line 49: | Line 49: | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
− | <td> | + | <td>Earth excavation</td> |
<td>Cubic yard</td> | <td>Cubic yard</td> | ||
<td>193</td> | <td>193</td> |
Summary of quantities - stormwater step pool case study.
Link to this table
Item | Unit | Quantity |
---|---|---|
Riprap 6 | Cubic yard | 12 |
Riprap 5 | Cubic yard | 37 |
Riprap 3 | Cubic yard | 41 |
Riprap 1 | Cubic yard | 37 |
Limestone blocks | Each | 26 |
Grout | Longitudinal section | 1 |
Natural stone boulders (12-18 inches) | Cubic yard | 15 |
Culvert removal | Linear foot | 75 |
Earth excavation | Cubic yard | 193 |
Seeding - floodplain mix | Acre | 0.21 |
Seeding - mesic savanna mix | Acre | 0.11 |
Turf seeding | Acre | 0.11 |
Bypass pumping | Longitudinal section | 1 |
Tree removal | Each | 8 |
Brush clearing | Square yard | 445 |
Silt fencing | Linear foot | 325 |
Erosion blanket - S-75 | Square yard | 1017 |
Erosion blanket - S-150 | Square yard | 533 |
Straw mulch | Square yard | 533 |
Temporary ditch/creek check - coir log | Each | 2 |
Construction entrance | Longitudinal section | 1 |