m
m
 
(3 intermediate revisions by 2 users not shown)
Line 5: Line 5:
 
*[[File:Operation and Maintenance Final.docx]]
 
*[[File:Operation and Maintenance Final.docx]]
 
*[[File:Water Quality Considerations Final.docx]]
 
*[[File:Water Quality Considerations Final.docx]]
 +
*[[File:Environmental Concerns final.docx]]
 +
*[[File:Cost Benefit Final.docx]]
 +
 +
<noinclude>
 +
==Related pages==
 +
*[[Overview for stormwater and rainwater harvest and use/reuse]]
 +
*[[Design criteria for stormwater and rainwater harvest and use/reuse]]
 +
*[[Construction specifications for stormwater and rainwater harvest and use/reuse]]
 +
*[[Operation and maintenance for stormwater and rainwater harvest and use/reuse]]
 +
*[[Water quality considerations for stormwater and rainwater harvest and use/reuse]]
 +
*[[Environmental concerns for stormwater and rainwater harvest and use/reuse]]
 +
*[[Cost-benefit considerations for stormwater and rainwater harvest and use/reuse]]
 +
*[[Case studies for stormwater and rainwater harvest and use/reuse]]
 +
*[[Calculating credits for stormwater and rainwater harvest and use/reuse]]
 +
*[[Definitions for stormwater and rainwater harvest and use/reuse]]
 +
*[https://stormwater.pca.state.mn.us/index.php?title=Requirements,_recommendations_and_information_for_using_Harvest_and_re-use/cistern_as_a_BMP_in_the_MIDS_calculator Requirements, recommendations and information for using Harvest and re-use/cistern as a BMP in the MIDS calculator]
 +
*[[Links for stormwater and rainwater harvest and use/reuse]]
 +
*[[References for stormwater and rainwater harvest and use/reuse]]
 +
*[[Technical support for stormwater and rainwater harvest and use/reuse]]
 +
</noinclude>
 +
<noinclude>
 +
[[Category:Level 3 - Best management practices/Nonstructural practices/Harvest and reuse‏‎]]
 +
</noinclude>

Latest revision as of 18:57, 18 July 2022

The following documents were submitted by the contractor as final drafts. The information from these was used to update the manual. The documents may have undergone slight formatting, but the content is essentially what was submitted by the contractor.


Related pages

This page was last edited on 18 July 2022, at 18:57.