m
m
Line 5: Line 5:
 
*[[File:Operation and Maintenance Final.docx]]
 
*[[File:Operation and Maintenance Final.docx]]
 
*[[File:Water Quality Considerations Final.docx]]
 
*[[File:Water Quality Considerations Final.docx]]
 +
*[[File:Environmental Concerns final.docx]]

Revision as of 15:51, 22 November 2016

The following documents were submitted by the contractor as final drafts. The information from these was used to update the manual. The documents may have undergone slight formatting, but the content is essentially what was submitted by the contractor.