(3 intermediate revisions by 2 users not shown) | |||
Line 17: | Line 17: | ||
*[[Baseline year]] | *[[Baseline year]] | ||
*[[Interpreting wasteload allocations based on flow/load duration curves]] | *[[Interpreting wasteload allocations based on flow/load duration curves]] | ||
+ | *[[Information about the 2019 Legislation and affected MS4s]] | ||
==TMDL toolkit for MS4 permit compliance== | ==TMDL toolkit for MS4 permit compliance== | ||
Line 55: | Line 56: | ||
<!-- | <!-- | ||
*[[http://www.pca.state.mn.us/index.php/view-document.html?gid=19456 List of approved TMDLs with MS4 Wasteload Allocations]] | *[[http://www.pca.state.mn.us/index.php/view-document.html?gid=19456 List of approved TMDLs with MS4 Wasteload Allocations]] | ||
− | |||
− | |||
− | |||
--> | --> | ||
*[[Technical guidance used by MPCA to develop guidelines for setting TMDL WLAs for regulated stormwater]] | *[[Technical guidance used by MPCA to develop guidelines for setting TMDL WLAs for regulated stormwater]] | ||
− | |||
− | |||
− | |||
*[[Guidance on what discharges should be included in the TMDL wasteload allocation for MS4 stormwater]] | *[[Guidance on what discharges should be included in the TMDL wasteload allocation for MS4 stormwater]] | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
*[[Construction activity by county]] | *[[Construction activity by county]] | ||
*Training modules | *Training modules |
Total Maximum Daily Loads (TMDLs) are EPA approved amounts of pollutant loading that can occur and have a water body meet water quality standards. This page is collection of links and resources to better understand, and meet, TMDL requirements.