(Created page with "<center><font size=3>'''Typical winter decommission and maintenance tasks'''</font size><br> Link to this table</center>...") |
(No difference)
|
Component | Typical decommissioning and winter maintenance tasks needed prior to spring startup 1 |
---|---|
Source Area/Collection Surface | *Clean residual de-icing material (sand, salt) from pavement prior to spring startup |
Collection System | *Drain and disconnect conveyances to prevent freeze/thaw damage |
Storage System | *Drain all water from above-ground outdoor storage tanks
|
Treatment System | *Drain and disconnect any pre-storage treatment devices that should be decommissioned during the winter
|
Distribution System | *Switch end use supply from harvested water to public water supply (if necessary)
|
Overflow/Bypass Systems | *Drain and disconnect to prevent freeze/thaw damage |