(Created page with "<center><font size=3>'''Typical winter decommission and maintenance tasks'''</font size><br> Link to this table</center>...") |
m |
||
(4 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
− | + | <font size=3>'''Typical winter decommission and maintenance tasks'''</font size><br> | |
− | Link to this [[Typical winter decommission and maintenance tasks|table]] | + | Link to this [[Typical winter decommission and maintenance tasks|table]] |
<table class="sortable"> | <table class="sortable"> | ||
Line 11: | Line 11: | ||
<tr> | <tr> | ||
<td>'''Source Area/Collection Surface'''</td> | <td>'''Source Area/Collection Surface'''</td> | ||
− | <td>*Clean residual de-icing material (sand, salt) from pavement prior to spring startup </td> | + | <td> |
+ | *Clean residual de-icing material (sand, salt) from pavement prior to spring startup </td> | ||
</tr> | </tr> | ||
Line 18: | Line 19: | ||
<tr> | <tr> | ||
<td>'''Collection System'''</td> | <td>'''Collection System'''</td> | ||
− | <td>*Drain and disconnect conveyances to prevent freeze/thaw damage</td> | + | <td> |
+ | *Drain and disconnect conveyances to prevent freeze/thaw damage</td> | ||
</tr> | </tr> | ||
Line 24: | Line 26: | ||
<tr> | <tr> | ||
<td>'''Storage System'''</td> | <td>'''Storage System'''</td> | ||
− | <td>*Drain all water from above-ground outdoor storage tanks | + | <td> |
+ | *Drain all water from above-ground outdoor storage tanks | ||
*Disconnect downspouts and/or pipe upstream of the tank to prevent rainwater/snowmelt from entering the tank during winter months | *Disconnect downspouts and/or pipe upstream of the tank to prevent rainwater/snowmelt from entering the tank during winter months | ||
*Disconnect electrical supply that controls equipment | *Disconnect electrical supply that controls equipment | ||
Line 34: | Line 37: | ||
<tr> | <tr> | ||
<td>'''Treatment System'''</td> | <td>'''Treatment System'''</td> | ||
− | <td>*Drain and disconnect any pre-storage treatment devices that should be decommissioned during the winter | + | <td> |
+ | *Drain and disconnect any pre-storage treatment devices that should be decommissioned during the winter | ||
*Decommission treatment system components per manufacturer’s guidelines | *Decommission treatment system components per manufacturer’s guidelines | ||
</td> | </td> | ||
Line 42: | Line 46: | ||
<tr> | <tr> | ||
<td>'''Distribution System'''</td> | <td>'''Distribution System'''</td> | ||
− | <td>*Switch end use supply from harvested water to public water supply (if necessary) | + | <td> |
+ | *Switch end use supply from harvested water to public water supply (if necessary) | ||
*Drain all water from pumps and conveyance to prevent freeze/thaw damage | *Drain all water from pumps and conveyance to prevent freeze/thaw damage | ||
*Disconnect electrical supply to the pump and control equipment | *Disconnect electrical supply to the pump and control equipment | ||
Line 52: | Line 57: | ||
<tr> | <tr> | ||
<td>'''Overflow/Bypass Systems'''</td> | <td>'''Overflow/Bypass Systems'''</td> | ||
− | <td>*Drain and disconnect to prevent freeze/thaw damage</td> | + | <td> |
+ | *Drain and disconnect to prevent freeze/thaw damage</td> | ||
</tr> | </tr> | ||
Line 60: | Line 66: | ||
</table> | </table> | ||
− | + | <noinclude> | |
− | + | [[category:Road salt table]] | |
− | + | </noinclude> | |
− | |||
− | [[category: |
Typical winter decommission and maintenance tasks
Link to this table
Component | Typical decommissioning and winter maintenance tasks needed prior to spring startup 1 |
---|---|
Source Area/Collection Surface |
|
Collection System |
|
Storage System |
|
Treatment System |
|
Distribution System |
|
Overflow/Bypass Systems |
|