m
(3 intermediate revisions by 2 users not shown)
Line 1: Line 1:
<center><font size=3>'''Typical winter decommission and maintenance tasks'''</font size><br>
+
<font size=3>'''Typical winter decommission and maintenance tasks'''</font size><br>
  
Link to this [[Typical winter decommission and maintenance tasks|table]]</center>
+
Link to this [[Typical winter decommission and maintenance tasks|table]]
  
 
<table class="sortable">
 
<table class="sortable">
Line 26: Line 26:
 
<tr>
 
<tr>
 
<td>'''Storage System'''</td>
 
<td>'''Storage System'''</td>
<td>*Drain all water from above-ground outdoor storage tanks
+
<td>
 +
*Drain all water from above-ground outdoor storage tanks
 
*Disconnect downspouts and/or pipe upstream of the tank to prevent rainwater/snowmelt from entering the tank during winter months
 
*Disconnect downspouts and/or pipe upstream of the tank to prevent rainwater/snowmelt from entering the tank during winter months
 
*Disconnect electrical supply that controls equipment
 
*Disconnect electrical supply that controls equipment
Line 36: Line 37:
 
<tr>
 
<tr>
 
<td>'''Treatment System'''</td>
 
<td>'''Treatment System'''</td>
<td>*Drain and disconnect any pre-storage treatment devices that should be decommissioned during the winter
+
<td>
 +
*Drain and disconnect any pre-storage treatment devices that should be decommissioned during the winter
 
*Decommission treatment system components per manufacturer’s guidelines
 
*Decommission treatment system components per manufacturer’s guidelines
 
</td>
 
</td>
Line 44: Line 46:
 
<tr>
 
<tr>
 
<td>'''Distribution System'''</td>
 
<td>'''Distribution System'''</td>
<td>*Switch end use supply from harvested water to public water supply (if necessary)
+
<td>
 +
*Switch end use supply from harvested water to public water supply (if necessary)
 
*Drain all water from pumps and conveyance to prevent freeze/thaw damage
 
*Drain all water from pumps and conveyance to prevent freeze/thaw damage
 
*Disconnect electrical supply to the pump and control equipment
 
*Disconnect electrical supply to the pump and control equipment
Line 54: Line 57:
 
<tr>
 
<tr>
 
<td>'''Overflow/Bypass  Systems'''</td>
 
<td>'''Overflow/Bypass  Systems'''</td>
<td>*Drain and disconnect to prevent freeze/thaw damage</td>
+
<td>
 +
*Drain and disconnect to prevent freeze/thaw damage</td>
 
</tr>
 
</tr>
  
Line 62: Line 66:
 
</table>
 
</table>
  
 
+
<noinclude>
 
+
[[category:Road salt table]]
 
+
</noinclude>
 
 
[[category:Table]]
 

Revision as of 18:09, 16 April 2020

Typical winter decommission and maintenance tasks

Link to this table

Component Typical decommissioning and winter maintenance tasks needed prior to spring startup 1
Source Area/Collection Surface
  • Clean residual de-icing material (sand, salt) from pavement prior to spring startup
Collection System
  • Drain and disconnect conveyances to prevent freeze/thaw damage
Storage System
  • Drain all water from above-ground outdoor storage tanks
  • Disconnect downspouts and/or pipe upstream of the tank to prevent rainwater/snowmelt from entering the tank during winter months
  • Disconnect electrical supply that controls equipment
  • Shut off makeup water supply to prevent water from entering the tank
Treatment System
  • Drain and disconnect any pre-storage treatment devices that should be decommissioned during the winter
  • Decommission treatment system components per manufacturer’s guidelines
Distribution System
  • Switch end use supply from harvested water to public water supply (if necessary)
  • Drain all water from pumps and conveyance to prevent freeze/thaw damage
  • Disconnect electrical supply to the pump and control equipment
  • Complete all recommended winter maintenance for pumps and controls
Overflow/Bypass Systems
  • Drain and disconnect to prevent freeze/thaw damage