m
m
 
Line 2: Line 2:
 
Link to this [[Typical winter decommission and maintenance tasks for rainwater harvesting|table]]
 
Link to this [[Typical winter decommission and maintenance tasks for rainwater harvesting|table]]
  
<table>
+
<table class="sortable">
 
<tr>
 
<tr>
 
<th>Component</th>
 
<th>Component</th>
Line 32: Line 32:
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Distribution System<td>
+
<td>Distribution System</td>
 
<td>
 
<td>
 
*Switch end use supply from harvested water to public water supply (if necessary)
 
*Switch end use supply from harvested water to public water supply (if necessary)
Line 40: Line 40:
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Overflow/Bypass Systems<td>
+
<td>Overflow/Bypass Systems</td>
 
<td>
 
<td>
 
*Drain and disconnect to prevent freeze/thaw damage</td>
 
*Drain and disconnect to prevent freeze/thaw damage</td>

Latest revision as of 15:46, 3 August 2022

Typical winter decommission and maintenance tasks for rainwater harvesting

Link to this table

Component Typical decommissioning and winter maintenance tasks needed prior to spring startup 1
Source Area/Collection Surface
  • Clean residual de-icing material (sand, salt) from pavement prior to spring startup
Collection System
  • Drain and disconnect conveyances to prevent freeze/thaw damage
Storage System
  • Drain all water from above-ground outdoor storage tanks
  • Disconnect downspouts and/or pipe upstream of the tank to prevent rainwater/snowmelt from entering the tank during winter months
  • Disconnect electrical supply that controls equipment
  • Shut off makeup water supply to prevent water from entering the tank
Treatment System
  • Drain and disconnect any pre-storage treatment devices that should be decommissioned during the winter
  • Decommission treatment system components per manufacturer’s guidelines
Distribution System
  • Switch end use supply from harvested water to public water supply (if necessary)
  • Drain all water from pumps and conveyance to prevent freeze/thaw damage
  • Disconnect electrical supply to the pump and control equipment
  • Complete all recommended winter maintenance for pumps and controls
Overflow/Bypass Systems
  • Drain and disconnect to prevent freeze/thaw damage

This page was last edited on 3 August 2022, at 15:46.