Ultra urban annual BMP treatment train performance summary
Link to this table

Ultra urban Annual BMP Treatment Train Performance Summary
Volume Performance Goal Runoff Volume (acre-ft.) 2.15
Retention Volume Provided by BMPs (acre-ft.) 97
Percent Runoff Volume Removed (%) 2.09
Total Phosphorous (TP) Performance Goal Particulate P Load (lbs.) 0.96
Performance Goal Dissolved P Load (lbs.) 0.79
Particulate P Load Removed by BMPs (lbs.) 0.93
Dissolved P Load Removed by BMPs (lbs.) 0.77
Percent TP Removed (%) 97
Total Suspended Solids (TSS) Performance Goal TSS Loads (lbs.) 319
TSS Load Removed by BMPs (lbs.) 309
Percent TSS Removed (%) 97