Sizing input parameters for permeable pavement for ultra-urban treatment train scenario.
Link to this table

Permeable Pavement Surface Area (ft2) Surface Area at Subgrade (ft2) Storage Depth (ft.) Drawdown Time (hrs.)
4,818 4,818 1.8 48

This page was last edited on 20 July 2015, at 20:54.

Template:Footer

/* Manually replaced by abbott Aug 6 '21 */