WinSLAMM control practice summary
Link to this table

Control Practices Control practice abbreviation Source area control practice Drainage system control practice
Review device routing List → Inputs → Network
Review watershed routing List → Inputs → Case (Watershed Data)
Review total watershed area is correct List → Inputs → Case (Watershed Data)
Confirm daily precipitation total are correct List → Time Series → Daily Precip
Compare watershed pollutant concentration to tabled values "Explore" tab; Report: Conc ppm; Term: 01 watershed inflow
Compare TSS/TP removal rate to typical tabled values Calculate removal using guidance in tabled values and mass balance terms from: List → Mass Balance → By Device and Variable

1For majority of variables, there are several methods which can be used to export results from P8. Refer to model documentation