SECTION 7 BMP SELECTION AND INSTALLATION

7.1

BMP Selection and Installation.

7.2

Permittees must select, install, and maintain the BMPs identified in the SWPPP and in this permit in an appropriate and functional manner and in accordance with relevant manufacturer specifications and accepted engineering practices.