*Linear projects: Retain on site the larger of 1.1 inches from all new impervious surfaces or 0.55 inches from all new and fully reconstructed impervious surfaces | *Linear projects: Retain on site the larger of 1.1 inches from all new impervious surfaces or 0.55 inches from all new and fully reconstructed impervious surfaces | ||
− | <font size=5>[[Design sequence flow chart| | + | <font size=5>Begin[[Design sequence flow chart|Flow chart]]</font size> |
− | ==Flow chart== | + | <!--==Flow chart==--> |
[[Does the project create one acre or more of new and/or fully reconstructed impervious surfaces? | [[Does the project create one acre or more of new and/or fully reconstructed impervious surfaces? | ||
*[[Design sequence flow chart#Goal does not apply|No]] | *[[Design sequence flow chart#Goal does not apply|No]] |
This is intended to take you through a design sequence that allows you to determine the appropriate performance goal at a site. Follow the questions below sequentially to arrive at a performance goal appropriate for your site.
BeginFlow chart
[[Does the project create one acre or more of new and/or fully reconstructed impervious surfaces?
The MIDS performance goal does not apply
Is the site located in a DWSMA, wellhead protection area, or near a drinking well?
Are there existing or proposed utilities, structures, or land use requirements (density, parking, setbacks, etc.) that make the Treatment Goal infeasible or cost prohibitive?
Is BMP relocation possible?
Are Flexible Treatment Option Alternatives number 1 or number 2 feasible?
Investigate Off-Site Considerations:
Provide site survey, maps, regulations, and/or cost estimates documenting infeasibility and cost-prohibitive nature of meeting the original Treatment Goal or FTO Alternatives
END