Line 100: | Line 100: | ||
</table> | </table> | ||
− | <table | + | <table> |
<tr> | <tr> | ||
<th width="200">Construction Sequence</th> | <th width="200">Construction Sequence</th> | ||
Line 111: | Line 111: | ||
<tr> | <tr> | ||
<td width="200">Pre Construction Meeting</td> | <td width="200">Pre Construction Meeting</td> | ||
− | <td> | + | <td></td> |
− | <td> | + | <td></td> |
</tr> | </tr> | ||
<tr> | <tr> |
PSH Operation | Polluting Activity |
---|---|
Vehicle Operations |
|
Outdoor Materials |
|
Waste Management |
|
Physical Plant Maintenance |
|
Turf and Landscaping |
|
Unique PSH Operations (Pools, Golf Courses, Marinas, Construciton, Restaurants, Hobby Famrs) |
Varies but includes:
|
Image Example | 200px |
Empty Circle | |
Quarter Circle | |
Half Circle | |
Full Circle |
Project: |
Location: |
Site Status: |
Date: |
Time: |
Inspector: |
Construction Sequence | Satisfactory/ Unsatisfacroty | Comments |
---|---|---|
1. Pre Construction | ||
Pre Construction Meeting | ||
Runoff diverted | - | - |
Facility area cleared | - | - |
Soil tested for permibility | - | - |
Project benchmark near site | - | - |
facility location staked out | - | - |
Temporary erosion and sedimant protection properly installed | - | - |
2. Excavation | ||
lateral slopes completly level | - | - |
Soils not compacted durring excavation | - | - |
Longitudinal slopes within design range | - | - |
Stockpile location not adjacent to excavation area and stablized with vegitation and/or silt fence | - | - |