PSH Operation |
Polluting Activity |
Vehicle Operations |
- Improper disposal of fluids down shop and storm drains
- Spilled fuel, leaks and drips from wrecked vehicles
- Hosing of outdoor work areas*Wash water from cleaning
- Uncovered outdoor storage of liquids/oils/batteries spills
- Pollutant wash-off from parking lot
|
Outdoor Materials |
- Spills at loading areas
- Hosing/washing of loading areas into shop or storm drains
- Wash-off of uncovered bulk materials and liquids stored outside, of particular concern in MN are road salt storage areas
- Leaks and spills
|
Waste Management |
- Spills and leaks of liquids
- Dumping into storm drains
- Leaking dumpsters (Dumpster juice)
- Wash-off of dumpster spillage
- Accumulation of particulate deposits
|
Physical Plant Maintenance |
- Discharges from power washing and steam cleaning
- Wash-off of fine particles from painting/sandblasting operations
- Rinse water and wash water discharges during cleanup
- Temporary outdoor storage
- Runoff from degreasing and re-surfacing
|
Turf and Landscaping |
- Non-target irrigation
- Runoff of nutrients and pesticides
- Deposition and subsequent washoff of soil and organic matter on impervious surfaces
- Improper rinsing of fertilizer/pesticide applicators
|
Unique PSH Operations (Pools, Golf Courses, Marinas, Construction, Restaurants, Hobby Famrs) |
Varies but includes:
- Discharge of chlorinated water from pools
- Improper disposal of sewage and grease
- Wash off of livestock manure
- Soil erosion
- Runooff of pesticides
- Salt storage
|
Image Example |
|
Empty Circle |
|
Quarter Circle |
|
Half Circle |
|
Full Circle |
|
Default 2 column, 10 row table
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
Default 3 column, 10 row table
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X | X |
X |
X | X |
X |
X | X |
X |
X | X |
X |
X | X |
Default 4 column, 10 row table
X |
X | X |
X |
X | X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X | X |
X | X |
X |
X |
X | X |
X |
X |
X |
X | X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
This is a test of the checklist format
BIORETENTION - Construction Inspection Checklist
Project: |
Location: |
Site Status: |
Date: |
Time: |
Inspector: |
Construction Sequence |
Satisfactory/ Unsatisfacroty |
Comments |
1. Pre Construction |
Pre Construction Meeting |
|
|
Runoff diverted |
|
|
Facility area cleared |
|
|
Soil tested for permibility |
|
|
Project benchmark near site |
|
|
facility location staked out |
|
|
Temporary erosion and sedimant protection properly installed |
|
|
2. Excavation |
lateral slopes completely level |
|
|
Soils not compacted during excavation |
|
|
Longitudinal slopes within design range |
|
|
Stockpile location not adjacent to excavation area and stablized with vegitation and/or silt fence |
|
|
3. Structural Components |
Stone diaphragm installed per plans |
|
|
Outlets installed pre plans |
|
|
Underdrain installed to grade |
|
|
Pretreatment devices installed per plans |
|
|
Soil bed composition and texture conforms to specifications |
|
|
4. Vegitation |
Construction Sequence |
|
|
Complies with planting specs |
|
|
Topsoil complies with specs in composition and placement |
|
|
Soil properly stabilized for permanent erosion control |
|
|
5. Final Inspection |
Dimensions per plans |
|
|
Pretreatment operational |
|
|
Inlet/outlet operational |
|
|
Soil/ filter bed permeability verified |
|
|
Effective stand of vegetation stabilized |
|
|
Construction generated sediments removed |
|
|
Contributing watershed stabilized before flow is diverted to the practice |
|
|
Comments |
Actions to be taken: |
Bioretention Construction Inspection Checklist |
BIORETENTION - Operation and Maintenance Checklist
Project: |
Location: |
Site Status: |
Date: |
Time: |
Inspector: |
Maintenance Item |
Satisfactory / Unsatisfactory |
Comments |
1. Debris Cleanout (Monthly) |
Contributing areas clean of litter and vegetative debris |
|
|
No dumping of yard wastes into practice |
|
|
Bioretention area clean of litter and vegetative debris |
|
|
2. Vegetation (Monthly) |
Plant height taller than design water depth |
|
|
Fertilized per O&M plan |
|
|
Plant composition according to O&M plan |
|
|
Undesirable vegetation removed |
|
|
Grass height less than 6 inches |
|
|
No evidence of erosion |
|
|
3. Check Dams/Energy Dissipaters/Sumps (Annual, After Major Storms) |
No evidence of sediment buildup |
|
|
Sumps should not be more than 50% full of sediment |
|
|
No evidence of erosion at downstream toe of drop structure |
|
|
4. Dewatering (Monthly) |
Dewaters between storms within 48 hours |
|
|
No evidence of standing water |
|
|
5. Sediment Deposition (Annual) |
Pretreatment areas clean of sediments |
|
|
Contributing drainage area stabilized and clear of erosion |
|
|
Winter sand deposition evacuated every spring |
|
|
6. Outlet/Overflow Spillway (Annual, After Major Storms) |
Good condition, no need for repair |
|
|
No evidence of erosion |
|
|
No evidence of any blockages |
|
|
7. Integrity of Filter Bed (Annual) |
Filter bed has not been blocked or filled inappropriately |
|
|
Comments |
Actions to be taken: |
Bioretention Operation, Maintenance and Management Inspection Checklist |