m |
m |
||
Line 46: | Line 46: | ||
<tr>Mulch layer less than 3" deep: needs additional mulch</tr> | <tr>Mulch layer less than 3" deep: needs additional mulch</tr> | ||
<tr>Yearly</tr> | <tr>Yearly</tr> | ||
− | <tr></tr> | + | <tr> </tr> |
− | <tr></tr> | + | <tr> </tr> |
− | <tr></tr> | + | <tr> </tr> |
− | <tr></tr> | + | <tr> </tr> |
− | <tr></tr> | + | <tr> </tr> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<tr>Erosion</tr> | <tr>Erosion</tr> | ||
<tr>*</tr> | <tr>*</tr> | ||
− | <tr></tr> | + | <tr> </tr> |
− | <tr></tr> | + | <tr> </tr> |
− | <tr></tr> | + | <tr> </tr> |
− | <tr></tr> | + | <tr> </tr> |
− | <tr></tr> | + | <tr> </tr> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<tr>Evidence of clogging</tr> | <tr>Evidence of clogging</tr> | ||
<tr>*</tr> | <tr>*</tr> | ||
− | <tr></tr> | + | <tr> </tr> |
− | <tr></tr> | + | <tr> </tr> |
− | <tr></tr> | + | <tr> </tr> |
− | <tr></tr> | + | <tr> </tr> |
− | <tr></tr> | + | <tr> </tr> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<tr>Evidence of standing water</tr> | <tr>Evidence of standing water</tr> | ||
<tr>*</tr> | <tr>*</tr> | ||
− | <tr></tr> | + | <tr> </tr> |
− | <tr></tr> | + | <tr> </tr> |
− | <tr></tr> | + | <tr> </tr> |
− | <tr></tr> | + | <tr> </tr> |
− | <tr></tr> | + | <tr> </tr> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<tr>Weeds present</tr> | <tr>Weeds present</tr> | ||
<tr>As needed</tr> | <tr>As needed</tr> | ||
− | <tr></tr> | + | <tr> </tr> |
− | <tr></tr> | + | <tr> </tr> |
− | <tr></tr> | + | <tr> </tr> |
− | <tr></tr> | + | <tr> </tr> |
− | <tr></tr> | + | <tr> </tr> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<tr>Accumulation of sediment, debris or trash</tr> | <tr>Accumulation of sediment, debris or trash</tr> | ||
<tr>*</tr> | <tr>*</tr> | ||
− | <tr></tr> | + | <tr> </tr> |
− | <tr></tr> | + | <tr> </tr> |
− | <tr></tr> | + | <tr> </tr> |
− | <tr></tr> | + | <tr> </tr> |
− | <tr></tr> | + | <tr> </tr> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<tr>Does drawdown time meet project requirements</tr> | <tr>Does drawdown time meet project requirements</tr> | ||
<tr>*</tr> | <tr>*</tr> | ||
− | <tr></tr> | + | <tr> </tr> |
− | <tr></tr> | + | <tr> </tr> |
− | <tr></tr> | + | <tr> </tr> |
− | <tr></tr> | + | <tr> </tr> |
− | <tr></tr> | + | <tr> </tr> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<td colspan=7>Inlet (Curb cut at tree opening, curb cut at catch basin, porous pavement, trench drain, or other</td> | <td colspan=7>Inlet (Curb cut at tree opening, curb cut at catch basin, porous pavement, trench drain, or other</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
</table> | </table> | ||
<noinclude>[[category:table]]</noinclude> | <noinclude>[[category:table]]</noinclude> | ||
<noinclude>[[category:Checklist]]</noinclude> | <noinclude>[[category:Checklist]]</noinclude> |
Maintenance inspection checklist for trees.
Link to this table
To access an Excel version of form (for field use), click here.
Project Name: | ||||||
Project Address: | ||||||
Owner Name: | ||||||
Owner Phone #: | ||||||
Inspector Name: | ||||||
Inspector Phone #: | ||||||
Date of Inspection: | ||||||
Weather at time of inspection: | ||||||
Date of last rainfall prior to inspection: | ||||||
Inspection item | Inspection frequency | Date last inspected | Need to inspect during current inspection | Describe signs of problems (if none, write "none") | Action needed and deadline | Date completed |
---|---|---|---|---|---|---|
Tree opening | ||||||
Inlet (Curb cut at tree opening, curb cut at catch basin, porous pavement, trench drain, or other |