Maintenance inspection checklist for trees.
Link to this table
To access an Excel version of form (for field use), click here.
Project Name: | ||||||
Project Address: | ||||||
Owner Name: | ||||||
Owner Phone #: | ||||||
Inspector Name: | ||||||
Inspector Phone #: | ||||||
Date of Inspection: | ||||||
Weather at time of inspection: | ||||||
Date of last rainfall prior to inspection: | ||||||
Inspection item | Inspection frequency | Date last inspected | Need to inspect during current inspection | Describe signs of problems (if none, write "none") | Action needed and deadline | Date completed |
---|---|---|---|---|---|---|
Tree opening | ||||||
Mulch layer less than 3" deep: needs additional mulch | Yearly | |||||
Erosion | * | |||||
Evidence of clogging | * | |||||
Evidence of standing water | * | |||||
Weeds present | As needed | |||||
Accumulation of sediment, debris or trash | * | |||||
Does drawdown time meet project requirements | * | |||||
Inlet (Curb cut at tree opening, curb cut at catch basin, porous pavement, trench drain, or other) | ||||||
Accumulation of sediment, debris or trash | * | |||||
Erosion | * | |||||
Pretreatment (curb cut at tree opening, catch basin, porous pavement, or other) | ||||||
Accumulation of sediment, debris or trash | * | |||||
Erosion | * | |||||
Evidence of clogging | * | |||||
Evidence of standing water | * | |||||
Distribution and drainage pipes | ||||||
Overflow/outlet structure | * | |||||
Other | ||||||
* | ||||||
* | ||||||
* | ||||||
* |
NOTES:
This page was last edited on 24 January 2023, at 21:35.