m |
m |
||
Line 44: | Line 44: | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
− | < | + | <td>Mulch layer less than 3" deep: needs additional mulch</td> |
− | < | + | <td>Yearly</td> |
− | < | + | <td> </td> |
− | < | + | <td> </td> |
− | < | + | <td> </td> |
− | < | + | <td> </td> |
− | < | + | <td> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<tr>Erosion</tr> | <tr>Erosion</tr> | ||
− | < | + | <td>*</td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
− | < | + | <td>Evidence of clogging</td> |
− | < | + | <td>*</td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
− | < | + | <td>Evidence of standing water</td> |
− | < | + | <td>*</td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
− | < | + | <td>Weeds present</td> |
− | < | + | <td>As needed</td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
− | < | + | <t>Accumulation of sediment, debris or trash</td> |
− | < | + | <td>*</td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
− | < | + | <td></td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
− | < | + | <td>Does drawdown time meet project requirements</td> |
− | < | + | <td>*</td> |
− | < | + | <td> </td> |
− | < | + | <td> </td> |
− | < | + | <td> </td> |
− | < | + | <td> </td> |
− | < | + | <td> </td> |
</tr> | </tr> | ||
<tr> | <tr> |
Maintenance inspection checklist for trees.
Link to this table
To access an Excel version of form (for field use), click here.
Project Name: | ||||||
Project Address: | ||||||
Owner Name: | ||||||
Owner Phone #: | ||||||
Inspector Name: | ||||||
Inspector Phone #: | ||||||
Date of Inspection: | ||||||
Weather at time of inspection: | ||||||
Date of last rainfall prior to inspection: | ||||||
Inspection item | Inspection frequency | Date last inspected | Need to inspect during current inspection | Describe signs of problems (if none, write "none") | Action needed and deadline | Date completed |
---|---|---|---|---|---|---|
Tree opening | ||||||
Mulch layer less than 3" deep: needs additional mulch | Yearly | |||||
* | ||||||
Evidence of clogging | * | |||||
Evidence of standing water | * | |||||
Weeds present | As needed | |||||
* | ||||||
Does drawdown time meet project requirements | * | |||||
Inlet (Curb cut at tree opening, curb cut at catch basin, porous pavement, trench drain, or other |