**areas within a [http://www.health.state.mn.us/divs/eh/water/swp/ Drinking Water Supply Management Area] (DWSMA) as defined in [https://www.revisor.mn.gov/rules/?id=4720.5100 Minn. R. 4720.5100], subp. 13., unless allowed by a local unit of government with a current MS4 permit; and | **areas within a [http://www.health.state.mn.us/divs/eh/water/swp/ Drinking Water Supply Management Area] (DWSMA) as defined in [https://www.revisor.mn.gov/rules/?id=4720.5100 Minn. R. 4720.5100], subp. 13., unless allowed by a local unit of government with a current MS4 permit; and | ||
**areas where soil infiltration rates are more than 8.3 inches per hour unless soils are amended to slow the infiltration rate below 8.3 inches per hour or as allowed by a local unit of government with a current MS4 permit. | **areas where soil infiltration rates are more than 8.3 inches per hour unless soils are amended to slow the infiltration rate below 8.3 inches per hour or as allowed by a local unit of government with a current MS4 permit. | ||
− | *If the bioretention practice is being designed to meet the requirements of the MPCA Permit, the required treatment volume is the water quality volume | + | *If the bioretention practice is being designed to meet the requirements of the MPCA Permit, the required treatment volume is the water quality volume V<sub>(wq)</sub> of 1 inch of runoff from the new impervious surfaces created from the project, calculated as an instantaneous volume. If part of the overall V<sub>wq</sub> is to be treated by other BMPs, subtract that portion from the V<sub>wq</sub> to determine the part of the V<sub>wq</sub> to be treated by the bioretention practice. Retrofit and supplemental systems do not need to meet this requirement, provided new impervious surfaces are not created. |
*Select the design infiltration rate from [[Design infiltration rates|the table]] based on the least permeable soil horizon within the first 3 feet below the bottom elevation of the proposed infiltration practice. | *Select the design infiltration rate from [[Design infiltration rates|the table]] based on the least permeable soil horizon within the first 3 feet below the bottom elevation of the proposed infiltration practice. | ||
*[[Design criteria for bioretention#Determine site infiltration rates (for facilities with infiltration and/or recharge)|Field-measured infiltration rates]] shall be divided by a safety factor of 2. | *[[Design criteria for bioretention#Determine site infiltration rates (for facilities with infiltration and/or recharge)|Field-measured infiltration rates]] shall be divided by a safety factor of 2. |
The following are requirements of the Construction Stormwater General Permit.