m
m
Line 1: Line 1:
  
<font size=3>Properties of permeable pavements. [[Properties of permeable pavement|(Link to this table)]]</font size>
+
<center><font size=3>'''Properties of permeable pavements.'''<font size><br>
 
+
[[Properties of permeable pavement|(Link to this table)]]</center>
 
<table>
 
<table>
 
<table border="1">
 
<table border="1">
Line 11: Line 11:
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td width="25%>Typical pavement surface thickness<sup>1</sup></td>
+
<td width="25%>Typical pavement surface thickness<sup>a</sup></td>
 
<td width="25%">5 to 8 inches</td>
 
<td width="25%">5 to 8 inches</td>
 
<td width="25%">3 to 4 inches (thicker for high wheel load applications)</td>
 
<td width="25%">3 to 4 inches (thicker for high wheel load applications)</td>
Line 17: Line 17:
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td width="25%">Bedding layer<sup>1,6</sup></td>
+
<td width="25%">Bedding layer<sup>a,f</sup></td>
 
<td width="25%">None</td>
 
<td width="25%">None</td>
 
<td width="25%">1 in. [http://www.transportation.org/Pages/default.aspx AASHTO] No. 57 stone</td>
 
<td width="25%">1 in. [http://www.transportation.org/Pages/default.aspx AASHTO] No. 57 stone</td>
Line 23: Line 23:
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td width="25%">Reservoir layer<sup>2,6</sup></td>
+
<td width="25%">Reservoir layer<sup>b,f</sup></td>
 
<td width="25%">[http://www.transportation.org/Pages/default.aspx AASHTO] No. 57 stone or per hydraulic design</td>
 
<td width="25%">[http://www.transportation.org/Pages/default.aspx AASHTO] No. 57 stone or per hydraulic design</td>
 
<td width="25%">[http://www.transportation.org/Pages/default.aspx AASHTO] No. 2, 3, or 5 stone</td>
 
<td width="25%">[http://www.transportation.org/Pages/default.aspx AASHTO] No. 2, 3, or 5 stone</td>
Line 52: Line 52:
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td width="25%">Longevity<sup>4</sup></td>
+
<td width="25%">Longevity<sup>d</sup></td>
 
<td colspan="3"><center>20 to 30 years</center></td>
 
<td colspan="3"><center>20 to 30 years</center></td>
 
</tr>
 
</tr>
Line 74: Line 74:
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td width="25%">Surface cleaning<sup>7</sup></td>
+
<td width="25%">Surface cleaning<sup>g</sup></td>
 
<td colspan="2"><center>Periodic vacuuming; replace if completely clogged and uncleanable</center></td>
 
<td colspan="2"><center>Periodic vacuuming; replace if completely clogged and uncleanable</center></td>
 
<td width="25%">Periodic vacuuming; replace jointing stones if completely clogged and uncleanable</td>
 
<td width="25%">Periodic vacuuming; replace jointing stones if completely clogged and uncleanable</td>
Line 96: Line 96:
 
</table>
 
</table>
  
<font size = 1>
+
<font size = 1><sup>a</sup>Thickness may vary depending on site and traffic conditions<br>
# Thickness may vary depending on site and traffic conditions
+
<sup>b</sup>Reservoir storage may be augmented by corrugated metal pipes, plastic arch pipe or plastic lattice crates<br>
# Reservoir storage may be augmented by corrugated metal pipes, plastic arch pipe or plastic lattice crates
+
<sup>c</sup>Supply and install minimum surface thickness only; minimum 30,000 sf with Minnesota 2012 prevailing labor wages. Does not include base reservoir, drainage appurtenances, engineering, or inspection<br>
# Supply and install minimum surface thickness only; minimum 30,000 sf with Minnesota 2012 prevailing labor wages. Does not include base reservoir, drainage appurtenances, engineering, or inspection
+
<sup>d</sup>Based on pavement being properly maintained. Resurfacing or rehabilitation may be needed after the indicated period<br>
# Based on pavement being properly maintained. Resurfacing or rehabilitation may be needed after the indicated period
+
<sup>e</sup>Depends primarily on on-site geotechnical considerations and structural design computations<br>
# Depends primarily on on-site geotechnical considerations and structural design computations
+
<sup>f</sup> ASTM D448 Standard Classification for Sizes of Aggregate for Road and Bridge Construction or ASASHTO M-43<br>
# ASTM D448 Standard Classification for Sizes of Aggregate for Road and Bridge Construction or ASASHTO M-43
+
<sup>g</sup>Periodic vacuuming frequency determined from inspection, intensity of use, and other potential sediment sources</font size>
# Periodic vacuuming frequency determined from inspection, intensity of use, and other potential sediment sources
 
</font size>
 

Revision as of 16:49, 4 January 2013

Properties of permeable pavements.
(Link to this table)
Properties Pervious concrete Porous asphalt PICP
Typical pavement surface thicknessa 5 to 8 inches 3 to 4 inches (thicker for high wheel load applications) 3 inches1
Bedding layera,f None 1 in. AASHTO No. 57 stone 2 inches of AASHTO No. 8 stone (MnDOT 3127 FA-3)
Reservoir layerb,f AASHTO No. 57 stone or per hydraulic design AASHTO No. 2, 3, or 5 stone 4 inches of AASHTO No. 57 stone over No. 2, 3 or 4 stone
Construction properties
  • Cast in place
  • Seven day cure
  • Must be continuously covered
  • Cast in place
  • 24 hour cure
  • No cure period
  • Manual or mechanical installation of pre-manufactured units
Installed surfacing cost3 $3 to $4/square foot $2/square foot $3 to $4/square foot
Minimum batch size
None
Longevityd
20 to 30 years
Overflow
Catch basin, overflow edge, elevated underdrain
Runoff temperature reduction
Cooling at the reservoir layer
Surface colors/texture Range of light colors and textures Black or dark grey colors Wide range of colors, textures and patterns
Load bearing capacity5
Handles all vehicle loads with appropriate surface and base/subbase layer material and thickness design
Surface cleaningg
Periodic vacuuming; replace if completely clogged and uncleanable
Periodic vacuuming; replace jointing stones if completely clogged and uncleanable
Other issues
  • Avoid concentrated deicers
  • Avoid winter sanding
  • Avoid seal coating
  • Avoid winter sanding
Avoid winter sanding
Design reference Report 522-2010 Hansen 2008NAPA Smith 2011 ICPI

aThickness may vary depending on site and traffic conditions
bReservoir storage may be augmented by corrugated metal pipes, plastic arch pipe or plastic lattice crates
cSupply and install minimum surface thickness only; minimum 30,000 sf with Minnesota 2012 prevailing labor wages. Does not include base reservoir, drainage appurtenances, engineering, or inspection
dBased on pavement being properly maintained. Resurfacing or rehabilitation may be needed after the indicated period
eDepends primarily on on-site geotechnical considerations and structural design computations
f ASTM D448 Standard Classification for Sizes of Aggregate for Road and Bridge Construction or ASASHTO M-43
gPeriodic vacuuming frequency determined from inspection, intensity of use, and other potential sediment sources